Orange County NC Website
management. This agreement will outline the necessary interim and long-term <br />solid waste needs of the development and identify the various agencies that will <br />be responsible for monitoring and enforcing acceptable waste management <br />practices, <br />b. The developer shall demonstrate compliance with the Orange County Regulated <br />Recyclable Materials Ordinance (]ZRMO) regardless of permitting jurisdiction <br />(Chapter 34 Article III of the Orange County Code of Ordinances), <br />c. The applicant shall develop a Solid Waste Management Plan for each portion of <br />the project for review and approval by Orange County Solid Waste (regardless of <br />permitting jurisdiction) for the life of the project. <br />Specifically, this plan shall address how land clearing, demolition, and <br />construction wastes will be disposed of and that recyclables and waste generation <br />rates be considered in plamvilg for waste collection services regardless of waste <br />or recycling provider, <br />d. Prior to the commencement of earth disturbing activities on the property, the <br />developer shall hold a deconstruction assessment meeting with Orange County <br />staff concerning the removal of existing buildings from the property. <br />e. All site plans shall contain a note indicating the following:: "Prior to any <br />demolition or construction activity on the site the applicant will hold a <br />deconstruction assessment conference with 'the County's Solid Waste staff <br />concerning buildings to be removed from this site." <br />f. The applicant shall provide both internal and external space for collection of solid <br />.waste and recyclable materials. Materials collected shall be at least equivalent to <br />the services provided by Orange County Solid Waste. <br />g. Waste collection areas shall be located in such a manner as to provide convenient <br />access for users of the facility. and safe passage for service vehicles. <br />h. The developer shall be required to place the following additional notes on any <br />approved site plan: <br />`Any gate design will include gate retainers.' <br />ii. `The user will be responsible for opening gates to the dumpster area on <br />collection days of any material(s) to be collected from this location.' <br />iii. `If any vehicles are parked in the refuse or recyclables collection <br />vehicle access area, the containers will not receive service until the <br />next scheduled collection day.' <br />iv. `Orange County will not be responsible for any pavement damage that <br />may result from service vehicles.' <br />v. `By Orange County Ordinance, clean wood waste, scrap metal and <br />corrugated cardboard, all present in construction waste, must be <br />recycled. ` <br />15 <br />