Orange County NC Website
ARTICLE 7 SECTION 7 5 PROCEDURES ON PD AMENDMENTS (CONTINUED) (`Yes' indicates complaint ; <br />`No' indicates non-compliance) <br /> RECOMMENDED <br />ORDINANCE STAFF EVIDENCE SUBMITTED PLANNING \_ <br />'REQUIREMENTS FINDINGS TO SUPPORT FINDINGS BOARD FINDINGS <br /> <br />7,5,1 The applicant has provided <br />Applications: for the following within the <br />Materials To Be Submitted application packet: <br /> 1. The arrangement of <br />In addition to, or as part of, land uses, specifically <br />the report described above, within Chapter Two (2) <br />applicants shall submit a ~ Land Uses and <br />preliminary development No Development Strategies Yes No <br />concept plan and proposals X Yes of the application, _ <br />in accord with (a) above <br />which shall show: 2. The location and function <br /> of vehicular/pedestrian <br />1. The general arrangement circulation, specifically <br />of land uses within the within Chapter Three (3) <br />proposed districts. Transportation of the <br />2. The general location and application, <br />function of the vehicular 3. The provision of utilities, <br />and pedestrian specifically within <br />circulation system. Chapter Four (4) <br />The general solutions to <br />3 Utilities and Other <br />. <br />the provision of utilities. Public Services of the <br /> application, <br />\ <br />4. The general arrangement <br />The arrangement of <br />4 ~ <br />of common facilities such . <br />common facilities and <br />as open space, <br />recreational installations, open space, specifically <br />improvements, etc. within Chapter Five (5) <br />~ <br /> of the <br />Open Space <br />5. A general description of application, <br />the method of financing <br />the installation and <br />5. A the method of financing <br />operation of the common the installation and <br />facilities. operation of the common <br /> facilities, specifically <br />6. A schedule of within Chapter Six (6) <br />construction of all Ownership and <br />elements of the proposal. Management of .the <br /> application, and <br /> 6. A schedule of <br /> construction of all <br /> elements of the proposal, <br /> as detailed throughout the <br /> application and the <br /> various exhibits including <br /> the Traffic Capacity <br /> Assessment contained <br /> within Appendix C of the <br /> application. <br />S:\BOCC\2008 BOCC Agendas\06-03-OB\Buckhorn Village\Attachment 4.doc 8 <br />