Browse
Search
Agenda - 06-03-2008-5b4
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 06-03-2008
>
Agenda - 06-03-2008-5b4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 7:53:20 PM
Creation date
8/28/2008 9:26:04 AM
Metadata
Fields
Template:
BOCC
Date
6/3/2008
Document Type
Agenda
Agenda Item
5b4
Document Relationships
Minutes - 20080603
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 7 SECTION 7 5 PROCEDURES ON PD AMENDMENTS (CONTINUED) (`Yes' indicates complaint ; <br />`No' indicates non-compliance) <br /> RECOMMENDED <br />ORDINANCE STAFF EVIDENCE SUBMITTED PLANNING \_ <br />'REQUIREMENTS FINDINGS TO SUPPORT FINDINGS BOARD FINDINGS <br /> <br />7,5,1 The applicant has provided <br />Applications: for the following within the <br />Materials To Be Submitted application packet: <br /> 1. The arrangement of <br />In addition to, or as part of, land uses, specifically <br />the report described above, within Chapter Two (2) <br />applicants shall submit a ~ Land Uses and <br />preliminary development No Development Strategies Yes No <br />concept plan and proposals X Yes of the application, _ <br />in accord with (a) above <br />which shall show: 2. The location and function <br /> of vehicular/pedestrian <br />1. The general arrangement circulation, specifically <br />of land uses within the within Chapter Three (3) <br />proposed districts. Transportation of the <br />2. The general location and application, <br />function of the vehicular 3. The provision of utilities, <br />and pedestrian specifically within <br />circulation system. Chapter Four (4) <br />The general solutions to <br />3 Utilities and Other <br />. <br />the provision of utilities. Public Services of the <br /> application, <br />\ <br />4. The general arrangement <br />The arrangement of <br />4 ~ <br />of common facilities such . <br />common facilities and <br />as open space, <br />recreational installations, open space, specifically <br />improvements, etc. within Chapter Five (5) <br />~ <br /> of the <br />Open Space <br />5. A general description of application, <br />the method of financing <br />the installation and <br />5. A the method of financing <br />operation of the common the installation and <br />facilities. operation of the common <br /> facilities, specifically <br />6. A schedule of within Chapter Six (6) <br />construction of all Ownership and <br />elements of the proposal. Management of .the <br /> application, and <br /> 6. A schedule of <br /> construction of all <br /> elements of the proposal, <br /> as detailed throughout the <br /> application and the <br /> various exhibits including <br /> the Traffic Capacity <br /> Assessment contained <br /> within Appendix C of the <br /> application. <br />S:\BOCC\2008 BOCC Agendas\06-03-OB\Buckhorn Village\Attachment 4.doc 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.