Orange County NC Website
8.8 e) -Method of disposal of <br />trees, limbs, sttamps and <br />construction debris <br />associated with the permitted <br />activity, which shall be by <br />some method other than <br />open burning. <br />According to the <br />application, and based on <br />statements made by the <br />_X Yes No applicant` during the <br />PUBLIC HEARING, trees, <br />limbs, stumps and <br />construction debris created <br />from land clearing activities <br />will be chipped and utilized <br />for mulch throughout the <br />site and/or disposed of at <br />an appropriate, legal, land <br />fill site. <br />_Yes N <br />o ~~ <br />ARTICLE 8 8 23 -PLANNED DEVELOPMENTS (CLASS A SPECIAL USE) SPECIFIC STANDARDS ("Yes" <br />indicates compliance; "No" indicates non-compliance) <br />ORDINANCE <br />REQUIREMENTS <br />STAFF <br />FINDINGS <br />EVIDENCE SUBMITTED <br />TO SUPPORT FINDINGS <br />RECOMMENDED <br />PLANNING BOARD <br />FINDINGS <br />In addition to the information <br />required in 8.2, and 8.8, the <br />following information shall be <br />submitted as part of the <br />application: <br />8.8.23.1 Additional <br />Information <br />In addition to the information <br />required in Subsections 8.2 <br />and 8.8, information shall be <br />supplied as part of the <br />application as per applicable <br />requirements of Article 7. <br />8.8.23.2 Standards <br />of Evaluation <br />The standards of evaluation <br />shall be as per applicable <br />sections of Article 7. <br />The application contains all <br />required information as <br />outlined within Article Seven <br />(7) of the Zoning Ordinance <br />X Yes No as detailed herein <br />The application contains all <br />required information as <br />outlined within Article Seven <br />X Yes No (7) of the Zoning Ordinance <br />- as detailed herein for <br />evaluating the <br />appropriateness of the <br />project <br />_Yes No <br />Yes No <br /> <br />S:\BOCC\2008 BOCC Agendas\06-03-08\Buckhorn Village\Attachment 4.doc 2 Q <br />