Browse
Search
Agenda - 06-03-2008-5b4
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 06-03-2008
>
Agenda - 06-03-2008-5b4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 7:53:20 PM
Creation date
8/28/2008 9:26:04 AM
Metadata
Fields
Template:
BOCC
Date
6/3/2008
Document Type
Agenda
Agenda Item
5b4
Document Relationships
Minutes - 20080603
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 8.8 -APPLICATION COMPONENTS ("Yes" indicates compliance; "No" indicates non-compliance) <br />ORDINANCE <br />REQUIREMENTS <br />8.8 a) -Twenty-six (26) <br />copies of the site plan <br />prepared by a registered <br />N.C. land surveyor, architect, <br />or engineer. <br />STAFF <br />FINDINGS <br />X Yes No <br />EVIDENCE SUBMITTED <br />TO SUPPORT FINDINGS <br />Twenty-six (26) copies of <br />the application and site plan <br />were submitted. The <br />documents were prepared <br />by Summit Consulting, a <br />registered <br />engineering/survey firm <br />within the State of North <br />Carolina and Mr. Scott <br />Murray of Scott T. Murray <br />Incorporated, a certified <br />landscape architect <br />RECOMMENDED <br />PLANNING <br />BOARD FINDINGS <br />_Yes No <br />8.8 b) -Elevations of all Architectural renderings <br />proposed structures to be were provided outlining the Yes No <br />used in the development. proposed height, <br />X Yes No construction materials, and <br /> elevations of the proposed <br /> structures. <br />8.8 c) -For Class A Special A Phase One <br />Uses twenty-six (26) copies Environmental Site <br />of the Environmental Assessment, completed by <br />Assessment and/or GEL Engineering of North _Yes No <br />Environmental Impact Carolina, was submitted as <br />Statement, if required by the. part of the application. <br />Orange County <br />Environmental Impact X Yes No The study was been <br />Ordinance. _ - forwarded and reviewed by <br /> State Agencies. <br /> Staff has determined that <br /> an Environmental Impact <br /> Statement is not required <br /> for this project as outlined <br /> within the County's <br /> Environmental Impact <br /> Ordinance <br />8.8 d) -A fee, as set by the ~ The application fee has <br />Board of County been paid. Yes No <br />Commissioners. <br />X Yes No <br />S:\BOCC\2006 BOCC Agendas\06-03-OS\Buckhorn Village\Attachment 4.doc 1 g <br />
The URL can be used to link to this page
Your browser does not support the video tag.