Orange County NC Website
ARTICLE 8 SECTION 8.2.4 ("Yes" indicates compliance; "No" indicates non-compliance) <br />ORDINANCE <br />REQUIREMENTS <br />STAFF <br />RECOMMENDED <br />EVIDENCE SUBMITTED PLANNING <br />TO SUPPORT FINDINGS BOARD FINDINGS <br />Article 8.2.4 requires the <br />applicant to address the <br />following: <br />FINDINGS <br />a) Method and adequacy of The applicant has indicated <br />provision for sewage X Yes No that the project will be X Yes No <br />disposal facilities, solid served via existing public <br />waste and water service. water and sewer lines <br /> maintained by the City of <br /> Mebane. Any and all. <br /> required utility <br /> improvements necessary to <br /> support the project, both on <br /> and off-site, shall be <br /> completed by the <br /> developer. <br />b) Method and adequacy of Fire protection will be <br />police, fire and rescue X Yes No provided by the Efland Fire <br />squad protection. Department, rescue service X Yes No <br /> by the Orange County <br /> Emergency Management, <br /> and police protection by the <br /> Orange County Sheriff <br /> The City of Mebane shall <br /> also provide public safety <br /> services through a <br /> Memorandum of <br /> Understanding with the <br /> County. <br />c) Method and adequacy of The property will have direct <br />vehicle access to the site X Yes No access onto West Ten and X Yes No <br />and traffic conditions Buckhorn Roads. <br />around the site. <br /> A traffic impact analysis <br /> (TIA) has been submitted <br /> and reviewed in accordance <br /> with the provisions of Article <br /> Thirteen (13) of the Zoning <br /> Ordinance. <br />Any and all necessary <br />external and internal <br />roadway improvements <br />shall be installed prior to the <br />commencement of non- <br />residential land use <br />operations within the project <br />as detailed within the TIA <br />and required by NC DOT. <br />d) Other use specific <br />standards as set forth in X Yes No As detailed herein X Ye No <br />Section 8.8 s <br />S:\BOCC\2008 BOGC Agendas\06-03-OS\Buckhorn Village\Attachment 4.doc 15 <br />