Orange County NC Website
<br />4 <br />1 .The conditions/standards will be agreed to by both the County and the Applicant that will <br />2 govern the development of the project in perpetuity, <br />3 • Concurrent with the next public meeting <br />4 .These standards will include regulations designed to: <br />5 m Regulate permitted uses for the project, <br />6 ®Establish design standards and architectural requirements, <br />7 .Establish standards for open space management and upkeep, <br />8 .Establish timelines for the implementation of necessary infrastructure improvements <br />9 (i.e. utilities, transportation, etc) <br />10 <br />11 BUCKHORN VILL/~GE -Design Standards and Solutions . <br />12 ' + The application demonstrates or indicates adherence approx. ninety (90) of the existing <br />13 standards in ED Design Manual, <br />14 ~ The applicant is proposing fourteen (14) Design Solutions that are `equal to or better than <br />15 what can be achieved through the strict adherence to the Design Manual' per Section 7.21.1 <br />16 of the Zoning Ordinance. <br />17 With respect to these Design Solutions, staff has found at this time'that: <br />18 ®Design Solutions One (1), Eight (8), and Nine (9) are considered reasonable by staff as <br />19 presenting a standards that is equal to or exceeds elements of the Design Manual, <br />20 ~ Design Solutions Three (3), Four (4), Five (5), Six (6), Seven (7), Ten (10}, are reasonable <br />21 but ought to be conditioned on the approval of site-specific development plans, and <br />22 ®Design Solutions Two (2), Eleven (11), Twelve (12), Thirteen (13), and Fourteen (14) <br />23 require the submittal of additional information by the applicant before staff can make a <br />24 finding <br />25 These findings will be developed conclusively before the next public hearing. <br />26 <br />27 History of Economic Development Planning in Orange Gounty <br />28 1975 - "Growth Options for Orange County" <br />29 ~ 125 citizens held a 2-day conference to map out a strategy <br />30 • 1981 -Land Use Element and Map of Orange County Comprehensive Plan <br />31 4 Goal Five -Growth <br />32 ~ Goal Six -Economic Develapment <br />33 • 1982 - "Policy Memorandum on Recommendations for Economic Development in Orange <br />34 County" <br />35 4 Dr. Ed Bergman led an effort to compile information and make recommendations <br />36 1988 - "Preliminary Economic Development Study" <br />37 a Sarah Rubin prepared 3 reports to start the strategic planning process <br />38 • 1989 - "Orange County Tomorrow" Economic Development Strategic Plan <br />39 ~ A 33-citizen Executive Committee prepares a plan which wins NACo awards and <br />40 directs the EDC work plan <br />41 • 1994 -Orange County Economic Development District Design Manual <br />42 ¢ Approved Process and Design <br />43 • 1995 -The Strategic Plan Update Begins <br />44 2001 -Economic Development District Hillsborough Area Amendments <br />45 2005 -Economic Development Commission Strategic Plan <br />46 • 2008 -Comprehensive Plan Update including a New Economic. Development Element <br /> <br />~\ <br /> <br />