Orange County NC Website
~~ <br />.~ <br />' ~ ~~ <br />.. CONSULTING <br />ENGINEERING ®ARCNITECTURE ID SURVEYING <br />33. Tom Struckmeyer <br />Smart Growth Tax Planning <br />If not here, where <br />If not now, when <br />If not by these follcs,who: <br />Response: Nat Needed <br />34. Tatiana Jones <br />Children cannot play <br />Traffic onlBetter traffic situation <br />Weighing station? <br />Response: The current traffic volume at peak times on Buckhorn Road <br />generated by the Flea Market is greater than the current capacity of <br />Buckhorn Road. The lack of proper traffic controls into and out of the <br />current Jockey Lot increases the delays, backups, and congestion. <br />The Buckhorn Village project will be guided by the traffic impact analysis <br />regarding roadway improvements, entrance and exit locations, and <br />signalization. These infrastructure improvements wilt increase the current <br />capacity of Buckhorn Road and thus reduce the current delays and traffic <br />jams that exist on a under capacity road. <br />35. Tom Darnell -lives on west <br />Response: Not Needed <br />36. National unnamed tenant <br />What if couple of acres on west side? <br />Five story building ladder truck <br />Maximum let them go <br />Response: Not Needed <br />March 19, 2008 <br />