Browse
Search
Agenda - 06-03-2008-5b5a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 06-03-2008
>
Agenda - 06-03-2008-5b5a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2012 11:48:05 AM
Creation date
8/28/2008 9:25:00 AM
Metadata
Fields
Template:
BOCC
Date
6/3/2008
Document Type
Agenda
Agenda Item
5b5a
Document Relationships
Minutes - 20080603
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13 <br />,1 Tracy Parrott: It is fully the intent in setting up or identifying these conversion factors to <br />2 establish a process by which specific land uses can be identified for the site and the <br />3 conversions be determined for them such that the overall development and makeup of <br />4 Buckhorn Village will stay consistent with the accesses that are being considered for the site <br />5 that you will see in the transportation section. A traffic impact analysis has been performed with <br />6 those land uses. So, by having the conversion factors, it allows for potential changes in land <br />7 use to keep the development consistent with the analysis that's been done on the trafl'sc side. <br />8 <br />9 Mr. Hutchins then introduced Scott Murray, who presented on the landscape, signage, and <br />10 general design of the project. <br />11 <br />12 Scott Murray: I have been sworn. My role in the Buckhorn development is that of landscape <br />13 architect. I've been practicing landscape architecture for 22 years in the state of North Carolina. <br />14 I'm also accredited by the U. S. Green Building Council. l've been asked to speak with you on <br />15 the open space, buffer plan, and landscape standards proposed for Buckhorn Village. The area <br />16 that comprises Buckhorn Village is identified in the EDD district as primary development area <br />17 with a maximum of 70% impervious surface. That is to say that the remaining 30% would either <br />18 be landscape buffers, open space, and other landscape features or islands. While merely a <br />19 third of this area is in the perimeter buffers identified in the landscape plan on the wall, the <br />20 remaining two-thirds would be in various landscape areas throughout the site, and it is <br />21 anticipated that it would be generally pretty evenly distributed among the three districts. The <br />22 landscape and buffer plan standards included in the PD text illustrates the buffer areas as well <br />23 as the NTC buffer along Interstate 85. It is proposed that the buffer along Interstate 85, which is <br />24 100 feet in width, would be subject to one of our alternate design solutions that are proposed <br />25 here. We are proposing up to 60% of a vegetated area would be allowed to be cleared to <br />~ ?6 accommodate the stormwater pond facility that is anticipated for that area. If you notice on the <br />27 site, the actual grade falls right along the boundary line between the Interstate property and the <br />28 site. This pond is designed for water quality, infiltration, and also for retention for irrigation <br />29 needs. Both aquatic vegetation as well as specimen trees and other types of landscaping that <br />30 is conducive to that type of facility are' proposed in that area. This is an important component of <br />31 our stormwater quality program for Buckhorn Village. <br />32 The plan on the wall also illustrates the various landscape standards that have been <br />33 developed to respond to design issues that are unique to the proposed development. <br />34 Specifically, the entrance drives, parking lot landscaping, building perimeter landscaping, <br />35 screen-in and_service areas, and landscaping for streets along shop-front areas are proposed <br />36 and are detailed: <br />37 These landscape standards, along with the proposed maximum floor areas and <br />38 building heights, are planned as an alternate design solution to the intensity standards that are <br />39 identified in the EDD Design Manual. The existing intensity standards include the building <br />40 volume ratio (BVR), the landscape volume ratio (LVR), and also the site volume ratio (SVR). <br />41 While those are more exacting in their measurement of development bulk, they do not easily <br />42 lend themselves to measuring development intensity in this stage of master planning, mainly <br />43 because we don't have the specific locations - dumpsters, building heights, parking lot layouts, <br />44 things of that nature. These standards are not easily understood in marketplace, primarily <br />45 because of the complexity of the mathematics that it takes to quantify all of the various ratios. <br />46 Most importantly, the existing intensity standards do not ensure a more attractive, necessarily <br />47 more sustainable development. For these reasons, our alternate design solution proposed <br />48 establishes the maximum floor area for Buckhorn Village of 23 and a maximum building height <br />49 of six stories. These measures of intensity represent a common language in the marketplace. <br />! Sp The following four slides represent various development patterns. Once specific tenants <br />51 are decided upon and their specific needs emerge, these four development patterns will be <br />~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.