Orange County NC Website
10 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />35 <br />36 <br />37 <br />38 <br />39 <br />40 <br />41 <br />42 <br />43 <br />44 <br />45 <br />46 <br />47 <br />48 <br />49 <br />SO <br />51 <br />1. Maintain or Promote the Public Health, Safety and General Welfare <br />2. Maintain or Enhance the Value of Contiguous Property <br />3. Be in Harmony with the Area in which it is Located and in Compliance w/ <br />Comprehensive Plan <br />=- Special Uses 8.2.1 <br />i iBuckhorn Village PD-ED, being located in the Buckhorn 1 I-85 EDD and being Developed by <br />the Proposed Guidelines will: <br /> <br />1. Provide a Safe, Sustainable Development that also Encourages Pedestrian Movement <br />contributing to the Health of the General Public as well as Allow for a Government <br />Services Site to Aid in Safety Needs <br />2. Maintain or Enhance Adjacent Property Values through the Quality of the Overall <br />Development and the Nature of Tenants Recruited <br />3. Comply w/ the Comprehensive Plan and All other Plans or Future Visions of Orange Co. <br />for this Area. Will also set the Tone and Standard for Future Development that will Spur <br />from BV-PD-ED. <br />SPEGIFiC SPECIAL USE REQUIREIMEiVTS <br />iBefore Issuance of Special Use Permit, Specific. Standards to Be Addressed Are the Method <br />and Adequacy of <br />1. Provision of Water, Waste Water, and Solid Waste <br />2. Police, Fire, and Rescue Squad Protection <br />3. Vehicular Access to the Site and Traffic Conditions Around the Site <br />4. Other Use Specific Standards .are set forth in Section 8.8 <br />-- Special Uses 8.2.4 a-d <br />Geof Gledhill asked if Tracy Parrott confirmed that he was sworn. Mr. Parrott confirmed fhat he <br />had been sworn in. <br />i ~IThe Buckhorn Village PD-ED, has proposed and as shown on the following slides <br />1. A Phased Utility Plan to Water and Waste Water Services through the Town of Mebane. <br />Solid Waste will be handled through Orange County and the Solid Waste Ordinance. <br />2. Fire or Rescue Station SITE may be located w/ in the Development and Police /Sheriff <br />Patrols to be Coordinated Through the Town of Mebane and Orange County. <br />3. A Phased Traffic Improvement Plan to follow Recommendations of a Final DOT <br />Approved Traffic Impact Analysis by Arcadis. <br />4. Other standards in Section 8.8.23 -Planned Developments defers to the .Requirements <br />of Article 7 -Planned Developments. <br />Mr. Hutchins introduced Bob Miller, who continued with the presentafion. <br />~( <br />Bob (Miller: I have been sworn. I'm a licensed professional engineer in the State of North <br />Carolina and have been an environmental consultant for 23 years, 19 of those years here in <br />North Carolina. I have performed an environmental site assessment on the land in question. <br />The site assessment was performed in accordance with the ASTM Standard E 1527-05, which ~ <br />is the accepted industry standard for performing environmental assessments. <br />