Orange County NC Website
private provider, where necessary . <br />73. Refuse Container Adjustment: That prior to issuance of a Zoning Compliance Permit for new construction, the proposed <br />location of the refuse container shall be rotated southward, to be on axis with the building face, to improve access for solid <br />waste vehicles. <br />74. Construction Waste: That per Orange County Ordinance, clean wood waste, scrap metal and corrugated cardboard, all <br />present in construction waste, must be recycled, and haulers of construction waste must be properly licensed. The <br />developer shall provide the name of the permitted waste disposal facility to which any land clearing or demolition waste <br />will be delivered. <br />State and Federal Approvals <br />75. State or Federal Approvals: That prior to issuance of a Zoning Compliance Permit for new construction, any required <br />State or federal permits or encroachment agreements (e.g., 401 water quality certification, 404 permit) shall be provided to <br />the Town of Chapel Hill. <br />76. North Carolina Department of Transportation Approvals: That prior to issuance of a Zoning Compliance Permit for new <br />construction, plans for any improvements to State - maintained roads or in associated rights -of -way shall be approved by the <br />Town and NCDOT. <br />Miscellaneous <br />77. Construction Management Plan: That prior to issuance of a Zoning Compliance Permit for new construction, a <br />Construction Management Plan, that includes the following details, shall be approved: 1) construction vehicle traffic <br />management, 2) on -site construction parking areas including plans to prohibit parking in residential neighborhoods, 3) <br />construction staging and material storage areas, 4) construction trailers and associated temporary structures, and 5) <br />proposed Town Noise Ordinance compliance. <br />78. Traffic and Pedestrian Control Plan: That prior to the issuance of a Zoning Compliance Permit for new construction, the <br />applicant shall provide a Work Zone Traffic Control Plan for Town approval, for vehicular movement on any public street <br />that will be disrupted during construction, including safe pedestrian circulation. At least 5 working days prior to any <br />proposed lane or street closure the applicant must apply for a lane or street closure permit. <br />79. Addressing: That prior to issuance of a Zoning Compliance Permit for new buildings, the Town shall assign a building <br />and unit address. <br />80. Unified Sign Plan: That prior to issuance of a Certificate of Occupancy for Phase 1 (described in the November 2013 TIA) <br />a Unified Sign Plan shall be approved by the Town Manager. <br />81. Construction Sign Required: That prior to the issuance of a Zoning Compliance Permit for new construction, a sign detail <br />shall be approved. Prior to the start of land disturbing activities when the Building Permit has been issued, the applicant <br />shall post a construction sign at the development site that lists the property owner's representative and telephone number, <br />the contractor's representative and telephone number, and a telephone number for regulatory information. Non - illuminated <br />signs with a maximum area of 32 square feet and height of 8 feet are allowed ( §5.14.3(g) of LUMO). <br />82. QPen Burning: That the open burning of trees, limbs, stumps, and construction debris associated with this development is <br />prohibited. <br />83. As -Built Plans: That prior to issuance of the first Certificate of Occupancy, the applicant shall provide to the Town <br />certified as -built plans for building footprints, parking lots, street improvements, storm drainage systems and stormwater <br />management structures, and all other impervious surfaces. <br />84. Vested Right: This Special Use Permit Modification constitutes a site specific development plan establishing a vested right <br />as provided by N.C.G.S. Section 160A -385.1 and Appendix A of the Chapel Hill Land Use Management Ordinance. <br />85. Continued Validity: That continued validity and effectiveness of this approval shall be expressly conditioned on the <br />continued compliance with the plans and conditions listed above. <br />86. Non- Severability: That if any of the above conditions is held to be invalid, approval in its entirety shall be void. <br />