Orange County NC Website
6. Key Regulatory Considerations <br />Tr= rotection Ordinance (2010) <br />• Highest priority for maintenance and tree <br />replacement on -site <br />• Fee -in -lieu of tree replacement is an option <br />• Modifications to standards possible if other <br />sustainability goals met: <br />— LEED <br />— Stormwater management <br />— Goals of the Town Comp Plan, etc. <br />35 <br />6. Key Regulatory Considerations <br />e Protection Ordinance (2010) <br />• Process for Calculating <br />— Determine net lot size <br />— Calculate required canopy coverage (40 %) <br />— Measure area of existing canopy to be protected <br />— Determine canopy deficit <br />— Calculate replacement trees needed to reach goal <br />36 <br />