Orange County NC Website
10 <br />Figure 1: Illustrative Streetscape Section <br />$WIIRRYf J �y <br />5 SEER LWE wATO IJNC ELECiHIL C.�CfBCCu <br />ILLUSTRATIVE STREET SCAM SEC110N <br />SCA krs. 000WW CIMMOOOMDWO MW o�&?YTedFoof archieens <br />e w <br />Solid Waste Plan <br />A Solid Waste Plan will be approved prior to issuance of a Zoning Compliance Permit and will address <br />the following: <br />1) New buildings will be required to comply with all applicable Town Standards for Solid Waste <br />Management. Screen walls and concrete pads will be compatible with adjacent buildings on the <br />site and comply with minimum Town of Chapel Hill Standards. <br />2) Dumpster pads will be constructed of concrete pavement with a minimum compression <br />strength of 4000 psi and sized in accordance with the number of dumpsters needed. The pads <br />will be a minimum of 20 feet deep. All dumpster pad areas shall be designed to accommodate <br />the Town's front loading refuse truck and have an inside turning radius of 40 feet. Backing <br />movements needed to access the pads shall not exceed 100 feet. Heavy duty pavements shall <br />be provided along the access route from the primary roadways to any dumpster area. Recycling <br />roll cart areas shall be provided in all dumpster layouts, and shall conform to all applicable Town <br />Standards. <br />Construction Management Plan <br />A Construction Management Plan will be approved prior to issuance of a Zoning Compliance Permit. <br />A construction staging and access plan shall be required for all new construction on the site. These <br />plans shall indicate routes for the material deliveries as well as construction staging and fencing areas. <br />All traffic control construction plans shall conform to the latest NCDOT Manual on Uniform Traffic <br />Control Devices. <br />Southern Orange County Government Services Campus I MASTER PLAN Page 6 <br />