Orange County NC Website
~~ <br />Craig: fiscal impact analysis is incomplete with respect to how (~ <br />County/Mebane staff will. be impacted. We will need to address our ~ `- <br />concerns. <br />o Me: Not enough time. <br />o Willie: None. Thanks for coming. We are interested in moving forward <br />on this project in terms of addressing issues/concerns. <br />o Tom: None at this time. The project is consistent with the Land Use Plan <br />and the Efland/Mebane Small Area Plan. I do not foresee any issues. <br />o Ren: Terry covered it. <br />o Chuck Edwards: <br />® This is a significant project. <br />® Procedurally we will be involved with driveway permits and <br />encroachment agreements. <br />We need a final TIA document. <br />® Sixty (60) to ninety (90) days are required to review the project. <br />We do not have a final draft of the document so that we can review <br />lt. <br />There will be phasing involved with this project and we need to be <br />involved in determitin_g this from the early stages,of the process. <br />® There will need to be some effort made to align driveways along <br />the roadway to avoid traffc problems. <br />m TIA needs to be weekday and weekend traffic analysis. Karen: <br />That is not included within. the draft document. <br />General discussion among the attendees. <br />( \, <br />6 <br />