Orange County NC Website
"~i.~~ <br />Access roads off of Buckhorn seem to be too much. <br />One (1) access road should be sufficient. <br />®. Align driveways with Petro to avoid conflicts. <br />m Waiver requests should be spelled out and not just requesting a <br />blanket waiver. <br />® Plan is just weird. <br />® Lighting. <br />a Green building standards should be employed. <br />® Buffer (MTC) should be respected a little more. <br />o Terry Hackett: <br />® Seventy (70) percent impervious surface -will not comply with <br />Neuse regulations (nitrogen loading, etc). Stormwater will be a <br />problem if this is the intended impervious surface load. <br />No net increase in twenty-four (24) hour storm will be allowed per <br />Neuse rules. <br />® Need to consider the possibility of lot leveUon-site bio-retention in <br />concert with a stormwater plan for the development project. <br />d This project will more than likely be subject to a NPDS permit. <br />o Karen Lincoln.: <br />® No connectivity within EDD, we need to look at that. <br />~~ •Design should be rethought to encourage more open space to <br />alleviate the `sea of asphalt' created by the numerous parking lots. <br />® TIA does not address potential impact on surrounding intersections <br />that will be impacted by this development. The TIA needs to <br />address changes to these intersections to handle traffic load. <br />o Daryl Russell (Mebane Engineer): Most of my comments have already <br />been made. <br />o Susan: Need building plans. <br />o Gene: Public hearing packet needs to go out on time. February 15, 2008 <br />the packet has to go out to BOCC. This is going to be a big hearing and <br />we may need to flunk about moving the meeting room to accommodate <br />more people. <br />o Sheriff: My interest is man power staff and who is responsible for what. <br />Our focus will change to external issues once the project is completed. <br />Does Mebane have an opinion if the roadways will betaken over once it is <br />completed. Ingress and egress is what we are concerned about during <br />construction and after construction is completed. Who will be responsible <br />for various access points of the project. <br />5 <br />