Orange County NC Website
~~ <br />o Brian Ferrell: Wish list for conditions will have to be agreed to by the ~ <br />developer as part of the conditional use process (i.e. statute changes for <br />approval of conditions) . <br />o Robert Davis: Gan there be conditions placed on the legislative process as <br />part of the approval of this project (Attorney to review) <br />o Tom Konslor: Env. Health make sure: <br />Existing wells and septic systems are properly abandoned (SUP <br />condition) <br />o Irrigation wells need to be identified A.S.A.P. <br />• a Timing of CO issuance with a complete wastewater system <br />completion (avoid same problems as we experienced with the <br />school project), needs to be guaranteed <br />o Grant Gale/Gayle Wilson: Waster management needs to be coordinated <br />with Mebane to avoid unnecessary complications. Let Mebane drive the <br />waste management train. Question for Attorney: this project has to <br />comply with our regulations. When it is annexed there will be a change <br />that means it will not have to abide by our standards. Can we impose a <br />condition that they will always follow our rules. ou waste management and <br />debris disposal ?? (Attorney review) Town Manager: I flunk that we are <br />going to basically use your standards for this project. <br />o Paul Thames: Concerned about water supply for project, pressure is an ! \ <br />issue and is my primary cocnern. We need to determine if there needs to . <br />be an elevated tank. Will they need to extend the existing water system to <br />create a loop water system. The school is the lowest point at the area and <br />it created problems (had to install a pressure pump .to run sprinkler <br />system}. Fire flow will be a big issue on this project. <br />o Montrena Hadley (Mebane Planner): Your steps involves •a SUP ?? <br />Craig: Yes, we are trying to get conditional use <br />o Jimmy Joe (Mebane Public Works): Water/sewer is going to be the big <br />problem. There will be pressure issues and lift station issues. <br />Craig: Michael, schedule follow up meetings with Mebane to continue <br />this review. <br />o Mike Tapp: Same concerns on water supply. Building clearances and <br />heights need to be. addressed. We will need to work with Mebane and <br />Efland to ensure acceptable development levels. Town Manager: Mutual <br />aid will also be involved - ali parties (Mebane, Efland, County) will be <br />responsible for fire protection. <br />o Glenn Bowles: <br />® Letter from Mebane for QPH indicating that they can address <br />utility issues or handle providing water/sewer. j <br />4 <br />