Browse
Search
Agenda - 06-03-2008-5b5d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 06-03-2008
>
Agenda - 06-03-2008-5b5d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 7:49:22 PM
Creation date
8/28/2008 9:24:00 AM
Metadata
Fields
Template:
BOCC
Date
6/3/2008
Document Type
Agenda
Agenda Item
5b5d
Document Relationships
Minutes - 20080603
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />® Mebane Engineer -Hydraulic study needs to be done at some point. Paul: are we <br />going to know what the highest point of the proposed buildings are going to be so that <br />we can actually provide some of. this detail. Craig: Yes, throughout the document <br />there is reference to the height of the various buildings per each district. <br />® Timing and phasing of project -answers are necessary <br />Forms will be available electronically <br />Schedule of project review -sheet -January 7, 2008 we determined that the <br />application was complete <br />® 9:55 a.m. Sheriff deputy showed up <br />All questions go to me <br />® February 5, 2008 the BOCC will be reviewing the proposed legal advertisement for <br />this project to go before the BOCC at the February 25, 2008 Quarterly Public Hearing <br />o After the QPH we will still be soliciting your comments <br />.Robert: Primary fire responder. Tapp: Efland. Town Manager: It will be Mebane's <br />fire district after it is done - it will be annexed when done. <br />Robert: Who holds the letter of credits: Town Manager: Mebane. Craig: We will <br />get updates from Mebane on all pertinent information so that we can authorize the <br />project. . <br />a Karen Lincoln.: After QPH it gets submitted to the Outboard for review as well as <br />Planning Board <br />® Craig: EDC as well <br />® Craig: TIA plan is stil_1 not complete <br />© Karen: TIA says build out shall be 2011 for the project <br />® Craig: We need to infuse green building/smart growth standards in this project <br />(impervious concrete, walkable communities, carbon offsets, etc) <br />® Robert: Is there a compatible zoning district in Mebane that would allow this to be <br />considered conforming. Manager: Yes, we have something comparable to your <br />regulations. <br />® Town Manager: Subdivision of property is a big concern over ensuring compliance <br />with standards of permit (i.e. SUP) -what will the terms mean ???? <br />a Town Manager: We want to make sure that when we take it over that the theme of <br />the development is consistent <br />® We need to begin developing a master plan for the entire EDD now that will include <br />Mebane as a primary planning partner in determining the future of the area. <br />o Comments: <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.