Browse
Search
Agenda - 06-24-2008-4r
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 06-24-2008
>
Agenda - 06-24-2008-4r
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2008 3:24:22 PM
Creation date
8/28/2008 9:23:33 AM
Metadata
Fields
Template:
BOCC
Date
6/24/2008
Document Type
Agenda
Agenda Item
4r
Document Relationships
2008-030 Finance - Amend Contract City of Durham 2005 COPS Interoperable Communication Technology Grant
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
Minutes - 20080624
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
S Grant- Sheriff Amendment to Contract four Use of Durham 2005 COPS Inter.
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\BOCC Grants\2000 - 2009\2008\2008 Grants
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 20 KVA Uniinterrnptable Power Supplies (UPS) <br />Two 20 KVA Uninterruptable Power Supplies (LJPS) will be purchased to <br />provide backup power for interoperable communications equipment to <br />provide surge protection for critical equipment, reduce brownout effects and <br />provide a temporary source of backup power until the facility generator <br />activates. This equipment will also provide a tertiary power source in the <br />event the facility emergency generator fails to activate, thus allowing staff <br />the time to affect repairs on the backup generator as necessary without <br />compromising emergency services. 20 KVA Unintemiptable Power Supplies <br />(iJPS) cost approximately $30,330 each for a total of $60,660. <br />3. Attachment B, Section C, Subsection C 1 Contracts/Consultants is changed <br />from: <br />Installation services and project management expenses not requested in the <br />original grant application do to the need to maintain emergency dispatch <br />services while the Orange County Emergency Management Services Center <br />is upgraded. This was an oversight during the process of drafting the grant <br />application in that the full scope of the upgrades necessary were not known at <br />that time. In order to complete the installation of equipment in the center, <br />while maintaining service, the existing equipment must be relocated to <br />another area of the building; and expense not contained within the normal <br />installation services comprised as part of the new equipment purchase. The <br />quote also includes project management to ensure proper transition during <br />the phases of construction. The project management expenses will not exceed <br />the $450 per hour maximum explained in the grant guidance. The estimated <br />cost of these services is $56,075. <br />to read as amended hereby: <br />Installation services and project management expenses not requested in the <br />original grant application do to the need to maintain emergency dispatch <br />services while the Orange County Emergency Management Services Center <br />is upgraded. This was an oversight during the process of drafting the grant <br />application in that the full scope of the upgrades necessary were not known at <br />that time. In order to complete the installation of equipment in the center, <br />while maintaining service, the existing equipment must be relocated to <br />another area of the building; and expense not contained within the non~nal <br />installation services comprised as part of the new equipment purchase. The <br />quote also includes project management to ensure proper transition during <br />the phases of construction. The project management expenses will not exceed <br />the $450 per hour maximum explained in the grant guidance. The estimated <br />cost of these services is $44,105. <br />4. The dates in Attachment A, Section C, Subsection C2 Project Timeline is <br />changed from: <br />Date <br />September 2005 <br />October 1, 2005 <br />July 1, 2007 <br />September 1, 2007 <br />September 5, 2007 <br />October 5, 2007 <br />Project Task/Activity <br />Award of grant funds anticipated <br />Procurement and purchasing process begins <br />Equipment delivered <br />Installation of equipment completed <br />Training users on use of equipment begins <br />User training completed <br />
The URL can be used to link to this page
Your browser does not support the video tag.