Orange County NC Website
NORTH CAROLINA <br /> ORANGE COUNTY <br /> lines that are placed within public right-of-ways. Copies of signed <br /> encroachment documents shall be provided to the Planning Department <br /> and the County Staff Engineer prior to Planning signatures on the Final <br /> Plat. <br /> 5. Show on the Final Plat, twenty (20)-foot permanent sewer line easements <br /> centered on all County-maintained sewer lines located outside of the <br /> NCDOT right-of-way. These easement areas shall remain free of <br /> structures, fences, and landscape plantings. <br /> 6. Sewer lines shall be designed in such a manner to allow gravity flow <br /> extensions to adjacent property rather than through the use of pump <br /> stations to the extent applicable to established engineering practices. <br /> 7. An Orange County Acreage Fee (recorded lot area acreage only), <br /> currently set at $1000 per acre for public sanitary sewer service, shall be <br /> paid at the time the Final Plat is submitted for planning signatures. The <br /> acreage fee is subject to change and, based on the acreage shown for <br /> the proposed 28 lots (approx. 6.25 acres). The total acreage fee will be <br /> approximately $6,250. <br /> 8. An Orange County Flat Fee for a public sanitary sewer service tap, <br /> currently $600 per unit, shall be paid at the time building permit <br /> applications are submitted for review and approval. This fee is subject to <br /> change and will be collected at the applicable rate at the time of review <br /> and approval of the building permit. <br /> 9. A Hillsborough Capital Facilities Fee, currently $2,672 per unit, shall be <br /> paid at the time building permit applications are submitted for review and <br /> approval. This fee is subject to change and will be collected at the <br /> applicable rate at the time of review and approval of the building permit. <br /> 10. For all locations where service is anticipated, a wye connector shall be <br /> installed as a service stub out, rather than a tap and saddle. <br /> C. Water Lines <br /> 1. Orange Alamance Water System, Inc. (OAWS) and the County Staff <br /> Engineer shall approve final water line construction drawings for the entire <br /> subdivision, including stubbed out service lines to each lot. No clearing or <br /> grading on the site shall occur until approval is obtained. No water lines <br /> shall be placed underneath paved or concreted areas with the exception <br /> of perpendicular crossings, which shall be constructed of ductile iron pipe. <br />