Orange County NC Website
He said there are also two projects in the outlier years, as outlined in the abstract, and <br /> these are the Main Branch Library Remodel for $1,200,000 and the Court Street Annex, which <br /> includes $100,000 in Years 6-10 for the replacement of the main distribution panel and <br /> electrical circuits throughout the building to meet modern standards. <br /> Chair Jacobs pointed out that the library kiosk illustration is at the Commissioners' <br /> places. <br /> Commissioner Price asked about Life Safety/ADA project. She asked if the designation <br /> of a fire alarm system means that this is when it is due to be fixed or if it is in need now. <br /> Paul Laughton said the replacement would happen during that year, and this is just the <br /> program based on need and life expectancy. <br /> Chair Jacobs suggested walking through the CIP and allowing the Commissioners to <br /> ask questions about specific projects. <br /> Paul Laughton said he can go through the major projects or entertain specific <br /> questions. <br /> Michael Talbert said there is an attachment of current year projects and these are the <br /> most important. <br /> Chair Jacobs suggested starting with current year projects. <br /> County Capital Proiects 2014-15 <br /> Paul Laughton said this is included in attachment A of the abstract. He said the Year 1 <br /> CIP is the only funding that is being approved by the Board. He said the other years are only a <br /> concept plan or guide. <br /> Paul Laughton referred to attachment 1 on County Capital Projects for 2014-15, <br /> which totals $5.3 million. He reviewed the following projects: <br /> Cedar Grove Community Center— includes $2,000,000 in Year 1 (FY 2014-15) for <br /> construction and adaptive reuse of the former Northern Human Services Center. Final Board <br /> decisions regarding use or disposition of the classroom wings will determine the finalized <br /> design and cost estimates for the project. <br /> Southern Orange Campus (Future Planning) — Design services of$400,000 are <br /> included in Year 1 (FY 2014-15), with site development infrastructure work of$3,600,000 in <br /> Year 2 (FY 2015-16) for campus buildings not associated with the existing Southern Human <br /> Services Center (SHSC). Expansion of the existing SHSC is included in a separate CIP <br /> project. <br /> Paul Laughton said the Southern Orange Future Planning is outlined on page 22 in the <br /> CIP document. <br /> Chair Jacobs said there has been some discussion about the Seymour Center and the <br /> parking area being at capacity. He asked if there is any proposed plan in relation to this. <br /> Michael Talbert said the Seymour Center is at capacity, and there are people parking <br /> on the grass and in the street. He said there is very little that can be done to improve that site <br /> until the SUP has been approved by the Town of Chapel Hill. <br /> Jeff Thompson said Chapel Hill is planning on reviewing the SUP modification plan in <br /> June, subject to approval by the advisory boards and Planning Board in May. He said if this <br /> goes according to schedule, staff will go into utilization planning for the site. He said this is <br /> part of that $400,000 <br />