Browse
Search
Minutes 04-10-2014
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2010's
>
2014
>
Minutes 04-10-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2015 11:22:05 AM
Creation date
9/17/2014 8:05:35 AM
Metadata
Fields
Template:
BOCC
Date
4/10/2014
Meeting Type
Work Session
Document Type
Minutes
Document Relationships
Agenda - 04-10-2014 - Agenda
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 04-10-2014 - Budget Work Session
Agenda - 04-10-2014 - 1
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 04-10-2014 - Budget Work Session
Agenda - 04-10-2014 - 2
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 04-10-2014 - Budget Work Session
Agenda - 04-10-2014 - 3
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 04-10-2014 - Budget Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
with pay as you go funds. She said the Board is fortunate to work well with both School <br /> Boards. She said no judgment can be made prior to the presentation, other than the decision <br /> that something must be done about this at some point. <br /> Paul Laughton referred to Attachment B, which is a budget comparison by function that <br /> looks at percentages in the large function areas. He said this fluctuates year to year and can <br /> fluctuate drastically. He said the capital funding policy has a target of 60 percent of projects <br /> for schools and 40 percent for County projects over a 10 year period. He said schools are <br /> currently 59.6 percent and County projects are at 40.4 percent. <br /> County Capital Proiects: <br /> Paul Laughton directed the Board to the first tab, beginning on page 16 of the CIP <br /> binder. He said there are several department heads here to answer questions. <br /> He also referred to page 5 of the abstract, which lists the following five new projects in <br /> years 1 through 5 of the CIP: <br /> Cedar Grove Community Center Library Kiosk— includes $180,000 in Year 2 (FY <br /> 2015-16) to provide patrons an automated material kiosk at the Cedar Grove Community <br /> Center providing 24 hour electronic access for checking in and out materials. <br /> Parking Lot Improvements— includes repair, resurfacing, and/or replacement of <br /> asphalt and concrete parking areas, including necessary curb and gutter systems at the <br /> following locations: $120,000 in Year 2 (FY 2016-15) at 501/503 W. Franklin Street; $510,000 <br /> in Year 4 (FY 2017-18) at Link Government Services Center/Annex and the District Attorney <br /> building; and 3 additional properties ($2,750,000 in Years 6-10). <br /> Life Safety—ADA — provides $25,000 in Year 1 (FY 2014-15) for the installation of <br /> automated access doors at West Campus and the Seymour Senior Center; $25,000 in Year 2 <br /> (FY 2015-16) for fire alarm system improvements/replacement at the Historic Courthouse; <br /> $60,000 in Year 5 (FY 2018-19) for elevator improvements at the Historic Courthouse; and <br /> additional fire alarm system design and installation at 4 locations ($65,000 in Years 6-10) <br /> Rogers Road <br /> Historic Rogers Road Neighborhood Community Center— During FY 2012-13, the Board of <br /> Commissioners approved the establishment of a capital project for the construction of a <br /> Historic Rogers Road Neighborhood Community Center with funds of$650,000. For Year 2 <br /> (FY 2015-16), $3,025,000 is recommended, which represents the County's 43% share of the <br /> Sewer Concept Plan costs to serve 86 parcels. <br /> Year two added 3 million <br /> Department of Environment, Agriculture, Parks and Recreation (DEAPR) <br /> Park and Recreation Facility Renovations and Repairs— provides funding each of <br /> Years 1-5 for the scheduling of planned renovations and repairs to facilities; a total of <br /> $900,000 is included over these five years. <br /> Paul Laughton noted that Rogers Road is obviously not a new project, but the specific <br /> addition of the $3,025,000 in year 2 is new, and this represents the County's share of the <br /> sewer concept plan. He said the same is true for DEAPR, which includes a new planned <br /> project to get renovations on schedule. <br />
The URL can be used to link to this page
Your browser does not support the video tag.