Browse
Search
Agenda - 09-18-2014 - Agenda
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 09-18-2014 - Joint Mtg. - Town of Mebane
>
Agenda - 09-18-2014 - Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2015 10:51:50 AM
Creation date
9/15/2014 1:45:11 PM
Metadata
Fields
Template:
BOCC
Date
9/18/2014
Meeting Type
Work Session
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U <br />Efland /Buckhorn /Mebane Utility Planning Area <br />UR <br />D3 <br />1 ac. <br />37 ac. <br />■ Ex. Pump Sadpn <br />Completed Graoy Sewer.Area A [:)Area D2 M Central Efland Phase 1 <br />ON Limits .Area 8 0 Area 031M Central Eflaad Phase 2 <br />Proposed Grsviry Sewer <br />` ETJ . area C . Area N QEl <br />WE Proposed 10 -inch F=r ma:n <br />Area D1 E] Area U5. E2 <br />w Completed Water Line <br />P.w •fix ..c. �r„wsr .m <br />ra Under Construclion Wafer Lira <br />M+•ea� Ems-: a,H .an..�:� <br />wavy <br />Proposed Lift MWion <br />A <br />C <br />T <br />n <br />_7, <br />w <br />Fr <br />� ,a =acmr.e ac-u <br />OFre <br />da.0 rn+ry narva au as�e�w pm.a�er <br />c) Efland Sewer Changeover .............................. ............................... Darrell Russell, City Engineer <br />Design, engineering and construction plans for the Efland Sewer Changeover are progressing <br />and nearly complete. The final design as currently planned includes the following major <br />components: <br />The existing Brookhollow pump station (550 GPM peak & .32 MGD average) force main will be <br />redirected to a new 12" gravity sewer line that will flow to a new pump station on West Ten <br />Road (700 GPM peak & .40 MGD average). A 12" force main from the West Ten Road pump <br />station will connect to the existing 18" gravity sewer in Rock Quarry Rd. that flows to the <br />existing South Regional pump station (2500 GPM peak & 1.0 MGD average). The designs also <br />provide for possible future flow increases to the West Ten Road pump station and the Southeast <br />Regional pump station by pump or impeller change outs subject to treatment capacity <br />availability. <br />Future Considerations <br />1. City and County staff will need to develop an "Operation and Maintenance Agreement" for <br />the operation of the Efland Sewer System prior to the changeover. <br />2. The City of Mebane will be developing policies and procedures to address protocol for new <br />connections in the Efland sewer service area once the changeover is completed, including a <br />flow tracking system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.