Orange County NC Website
1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />35 <br />36 <br />37 <br />38 <br />39 <br />40 <br />41 <br />42 <br />43 <br />44 <br />45 <br />46 <br />47 <br />48 <br />49 <br />50 <br />23 <br />landscaping and new furnishings and equipment. He said this will show in years 6 -10, and the <br />construction is scheduled to start in year 6, with debt service starting in year 7. He said the <br />impact of personnel and operations starts in year 7. <br />Commissioner Gordon asked what happened to the overall plan and how this would fit <br />into it. <br />Dave Stancil said staff did propose taking a look at the role of community centers, and <br />this is one of those centers. He is expecting that study would take place in the next year or so. <br />He said this is a placeholder for what could potentially be done on this footprint and what might <br />be needed in terms of operations, equipment and personnel. <br />Commissioner Gordon said a placeholder is very different from a commitment. <br />Dave Stancil said as each CIP season rolls around, this will be made clearer. <br />Commissioner Gordon said she has looked at the population of each township and she <br />wonders if there will be two centers, or a center for each township. She said there needs to be <br />an overall vision of what is going to be built. <br />Michael Talbert said this is just a plan at this time, and it is just a placeholder. He said <br />details will be worked out in the next couple of years. <br />Follow -Up Items: <br />• Jail Capacity Update <br />Staff and consultants have confirmed a recommended facility capacity range of between 144 <br />and 216 beds. This recommendation is fluid around the variables of capacity expansion, the <br />acceptance and economics of housing Federal detainees, the operational consideration of the <br />next Sheriff, and the findings of the Jail Alternatives Work Group. <br />Additional information regarding the estimated costs of this capacity range will be provided <br />during the June 10, 2014 work session. The current CIP information is adequate for the most <br />intense initial build program should the Board choose this option. Staff will return in the fall with <br />an update once the Jail Alternatives Work Group finalizes its recommendations, the new Sheriff <br />provides input and operational direction, and the Request for Qualifications (RFQ) process to <br />identify the project designer is underway. Staff estimates that the Board will be presented with <br />an award for the designer in January, 2015. <br />Paul Laughton referred to the jail capacity update information as provided in the green <br />sheet at the Commissioner's places. He said the plan would be for staff to return in the fall <br />after the workgroup has returned with recommendations and cost estimates. <br />Commissioner Gordon asked what is currently included in the budget for this. <br />Paul Laughton said there is a total of $30 million included right now. <br />Commissioner Gordon said there was talk about two modules. <br />Paul Laughton said this talks about building a core facility with initial construction for <br />capacity of 144 beds. He said there is a range of 144 to 216 beds. <br />Commissioner Gordon asked where this stands. She asked if something has to be <br />done to change from the $30 million to a lower dollar amount. <br />Jeff Thompson said the $30 million is a placeholder for the large facility. He said right <br />now staff has corroboration with consultants on a range of general beds between 144 and 216. <br />He said the efficacy of the jail alternatives programs, the impact of the new sheriff, and the <br />design process are all unknown at this point. He said the elegance of this is the ability to build <br />smaller for future expansion if needed. <br />Commissioner Gordon asked if the $30 million is in the out years. <br />Paul Laughton said this is in year 4. <br />Commissioner Gordon said this will affect their debt capacity. She said right now there <br />is sufficient debt capacity. She asked if more information will be known by fall. <br />