Browse
Search
Agenda - 06-24-2008-4ee
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 06-24-2008
>
Agenda - 06-24-2008-4ee
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 6:50:13 PM
Creation date
8/28/2008 9:22:17 AM
Metadata
Fields
Template:
BOCC
Date
6/24/2008
Document Type
Agenda
Agenda Item
4ee
Document Relationships
Minutes - 20080624
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br />Task 3: Formatting/Assembling Comprehensive Plan <br />Contractor: <br />SYNTHESIZE DOCUMENTS <br />Coordinate with Element Managers to collect any material prepared by county <br />s#aff to fill ident~ed gaps, as directed by the Project Management Team. <br />® Fallowing standardized formatting guidelines {to be developed by Element <br />Managers and approved by the Project Management Team) and the Table of <br />Contents that were completed for each Element, synthesize documents into a <br />draft Comprehensive Plan. <br />Adopted County Profile Element shall be inserted into the draft. <br />County Staff: <br />® Complete and convey any material required to fill gaps as instructed by the <br />Project Management Team. <br />4 Provide formatting guidelines. <br />® Provide, in agreed upon format, Sections l V of the Comprehensive Plan, as <br />described in Attachment 1. <br />Deliverables: <br />p 120 black-and-white copies of Draft Comprehensive Plan based on detailed <br />Tables of Contents developed far each Element and genera! Table of <br />Contents {i.e. intro., Planning Principles, Admin., and Monitoring} for overall <br />Comprehensive Plan {Attachment 1 }. An electronic copy shall also be <br />provided an CD. <br />Schedule: Completed 6y end of February 2005. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.