Orange County NC Website
i <br /> 1 <br /> ORANGE COUNTY <br /> BOARD OF COM)lUMONE 1S <br /> ACTION AGENDA ITEM ABSTRACT <br /> Meeting Date: March 21, 1995 <br /> Action Agenda <br /> Item # 13t-A <br /> SUBJECT: CONTRACT WITH U.S. GEOLOGICAL SURVEY - WATER RESOURCES STUDY <br /> DEPARTMENT: PLANNING PUBLIC HEARING: YES % NO <br /> ATTACHMENT(S): INFORMATION CONTACT: <br /> Contract/cover letter Dave Stancil, Extension 2590 <br /> TELEPHONE NUMBERS: <br /> Hillsborough- 732-8181 <br /> Chapel Hill - 967-9251 <br /> Durham - 688-7331 <br /> Mebane - 227-2031 <br /> PURPOSE: To contract with the U.S. Geological Survey (USGS) for a water <br /> resources study, as budgeted in the 1994-95 Water Resources <br /> project budget. <br /> BACKGROUND: The Orange County Water Resources Committee was charged in <br /> 1993 with assessing the status of ground water quantity and <br /> quality in the County.Part of that effort calls for a Ground Water <br /> Resource Investigation to be performed. The first phase of the <br /> investigation is a jointly-funded study of ground water recharge. <br /> The study, "Determination of Recharge Rates to the Regolith- <br /> Bedrock Aquifer System in Orange County, North Carolina", <br /> would be funded by the County and USGS. The study will <br /> produce baseline information about the amount of ground water <br /> available in different parts of the County. Products will be GIS- <br /> compatible and become part of the County's GIS database. Data <br /> produced will not be for site-specific analysis, but will be <br /> important for long-range planning considerations.Funding for the <br /> study was included in the 1994-95 Water Resources budget. <br /> The project timetable has been slightly altered to adjust to USGS <br /> funding availability. The project will begin in June 1995 and <br /> conclude in October 1996. <br /> The project will span two County fiscal years, with a cost of <br /> $78,500.The County share of the cost is$39,250 ($19,625 in both <br /> the 1994-95 and 1995-96 fiscal years).Entering into the contract <br /> would obligate the County to fund the FY 96-97 installment. <br /> RECOMMENDATION: The Administration recommends that the Board approve the <br /> contract and authorize the Chair to sign. <br />