Browse
Search
2014-479-E AMS - Triangle Landscaping, Inc. for Whitted Human Services Center drainage improvements $3,700
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-479-E AMS - Triangle Landscaping, Inc. for Whitted Human Services Center drainage improvements $3,700
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2017 4:08:13 PM
Creation date
9/3/2014 4:08:28 PM
Metadata
Fields
Template:
BOCC
Date
9/3/2014
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Manager signed
Amount
$3,700.00
Document Relationships
R 2014-479 AMS - Triangle Landscaping, Inc. for Whitted Human Services Center drainage improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: A7A24A38-7FF8-44AF-A389-F32CAA059A40 <br /> Triangle Landscaping Inc. <br /> Estimate <br /> PO Box 144 <br /> Stem, NC 27581 Date Estimate # <br /> 8/7/2014 221 <br /> Name 1 Address <br /> Orange County Asset Management Services <br /> 131 West Margaret Lane <br /> Hillsborough,NC 27278 <br /> Project <br /> Description Qty Cost Total <br /> Estimate for drainage behind Whitted building. <br /> Down spout adaptors 3 25.00 75.00 <br /> 6" double wall plastic pipe Eighty feet 4 75.00 300,00 <br /> 8" double wall plastic pipe Sixty feet 3 100.00 300.00 <br /> 6"Elbow 1 20.00 20.00 <br /> 8"x 8"x 6"Wye 1 100.00 100.00 <br /> 6" snap couplings 4 8.00 32.00 <br /> 8" snap couplings 3 12.00 36.00 <br /> 8"Elbow 1 40.00 40.00 <br /> 15" catch basin(This is a special made box and has to be ordered) 1 800.00 800.00 <br /> One Ton of Gravel to be placed around catch basin. This includes 50.00 50.00 <br /> delivery <br /> Half a yard of concrete(around 18 bags of sacrete) to make collar 21 7.00 147.00 <br /> around catch basin. Three bags to tie in ext. 12"TCP <br /> Excavator and Two men for 1.5 days 100.00 17800.00 <br /> Total $3,700.00 <br /> Customer Signature <br />
The URL can be used to link to this page
Your browser does not support the video tag.