Browse
Search
Agenda - 09-04-2014 - 6a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 09-04-2014 - Regular Mtg.
>
Agenda - 09-04-2014 - 6a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2016 10:18:05 AM
Creation date
9/2/2014 11:37:33 AM
Metadata
Fields
Template:
BOCC
Date
9/4/2014
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Minutes 09-04-2014
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13 <br /> 1 clearly this needed to be reprioritized. He said, in 2008 and 2009 when revenues were up, the <br /> 2 CIP had the boiler project slated for 2010. He said the decline in revenue caused this <br /> 3 necessary maintenance to be deferred. He said this will now be taken care of over the <br /> 4 summer, but that means something else has to give. <br /> 5 He reviewed the slide listing recommendations. He said the renovations have been <br /> 6 refined and revised to reduce the amount from $205 million to $160 million. <br /> 7 Todd LoFrese discussed the photos of the issues of Estes Hill Elementary, including <br /> 8 aging infrastructure, ADA egress issues, campus security and monitoring, and lighting. He said <br /> 9 there is a recommendation to add a small administrative area to provide a secure vestibule and <br /> 10 point of entry. He said the rear classroom wings have also had moisture issues and <br /> 11 deconstruction and reconstruction are recommended here. He said there is also a <br /> 12 recommendation to enclose the front area of the school with a breezeway. He said this school <br /> 13 was not designed in a time of kiss and go drop off, so there is a lot of traffic conflict. He said <br /> 14 there is no designated access point for the different modes of transportation. He said the <br /> 15 recommendations for Estes Hills Elementary would increase the schools capacity by 58 <br /> 16 students, bringing it to the Orange County standard of 585 students. <br /> 17 Todd LoFrese said looking at this type of approach for all of the older schools could help <br /> 18 increase district capacity by a total of 660 seats. <br /> 19 He noted that even base level renovation needs would cost $50 million, without <br /> 20 addressing capacity. <br /> 21 <br /> 22 Pam Jones said the OCS facilities assessment is a mirror image of what was just <br /> 23 presented, and the needs of this district also total $160 million. She said the facilities <br /> 24 assessment is 913 pages long and reflects a lot of deferred maintenance and deconstruction <br /> 25 needs. <br /> 26 She said OCS has started to address some of the deferred maintenance, and some of <br /> 27 this may be added to the budget through fund balance appropriations. She said the addition of <br /> 28 a maintenance staff person has also been proposed. She said the issues are too big to <br /> 29 address, even with a bond, given the amount needed from both districts. She said the board of <br /> 30 education has just begun to dissect the facilities report, and this will be brought back in June to <br /> 31 work out priorities to present to the Board. She said there are two projects in the OCS CIP, and <br /> 32 those are elementary#8 and the classroom wing at Cedar Ridge High School. <br /> 33 <br /> 34 Chair Jacobs asked Todd LoFrese about the cost to build Northside. <br /> 35 Todd LoFrese said Northside cost $24 million. <br /> 36 Chair Jacobs said the cost for Estes Hills renovations is $16 million, which is almost as <br /> 37 much as the cost to build a new school. He asked when a decision is made to retire a school <br /> 38 and build a new one. <br /> 39 Todd LoFrese said the challenge here is that there are very few spaces within the <br /> 40 CHCCS district boundaries to build new schools. He said a complete deconstruction and new <br /> 41 build on site, given the fact that the schools are at 100 percent capacity, would be a challenge. <br /> 42 He said there are so many different needs at so many different schools, and the price tag is <br /> 43 often outside of reality. He said the goal was to identify the parts of the schools that were in <br /> 44 good shape and could be renovated to add another 50 years of life expectancy. He said the <br /> 45 schools that are beyond repair, too costly or with difficult code issues were recommended for <br /> 46 deconstruction. <br /> 47 Commissioner McKee asked about the $750,000 planning budget request. He asked if <br /> 48 this was directed to a specific facility. <br />
The URL can be used to link to this page
Your browser does not support the video tag.