Browse
Search
Agenda - 09-08-2014 - C5
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 09-08-2014 - Quarterly Public Hearing
>
Agenda - 09-08-2014 - C5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2015 9:41:24 AM
Creation date
9/2/2014 10:36:35 AM
Metadata
Fields
Template:
BOCC
Date
9/8/2014
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C.5
Document Relationships
Minutes 09-08-2014 QPH
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
112 <br />Article 5: Uses <br />Section 5.10: Standards for Telecommunication Facilities <br />designated for UDO /Comprehensive Plan- related public hearings 13. The fee for <br />modifying the Plan shall be that as set forth in the Orange County Schedule of Fees. <br />(F) Withdrawal from the Plan is permitted if any owner submits, to the Planning Director, a <br />notarized statement requesting same. Upon receipt of the request, including any fee for <br />modifying the Plan as set forth in the Orange County Schedule of Fees, the Planning <br />Director shall inform interested parties that the property has been withdrawn from <br />consideration. Removal of the property from the Plan shall be processed as a <br />modification as detailed herein. <br />5.tQ.3 Annual Telecommunications Projection Meeting (ATPM <br />. NA) Purpose and Outcome <br />(1) The purpose of the ATPM meeting is to allow for a complete review of co catior <br />opportunities, address coverage issues, and discuss the location of ne ded <br />telecommunication support structures with providers who intent on s mitting <br />development applications for action by the County. The intended tcon of the <br />meeting is to allow the County and interested parties to develop plan for facility <br />deployment within the County that provides reasonable cover ge based on the <br />n eds of the County and its residents, while minimizing the otal number of <br />nee ed telecommunication support facilities, including m' imizing the <br />intrust ness of such facilities, and encouraging the d elopment of a more <br />efficient lecommunication network. <br />(2) The intende outcome of the meeting is an and tanding amongst the Planning <br />Director and p eiders on areas of the County here telecommunication support <br />facilities are nee d and application reques or the year should be focused. <br />(13) Applicability <br />(1) By December 315' of eac calendar ar, telecommunication providers shall <br />submit to the Planning Dire or a an indicating proposed search rings for <br />anticipated telecommunicatio pport structures. This plan shall identify areas <br />where providers are looking t to ate facilities, as well as identify those areas of <br />the County that are unders rved b existing facilities. <br />(2) As of the effective date f this Ordinan amendment any pending applications <br />that have not receiv a zoning complian e permit or a special use permit shall <br />meet all requirem is of this Ordinance, inc ding, but not limited to submission <br />deadlines, appli tion standards and processi , excluding the ATPM <br />requirement. <br />(C) Meeting Specific <br />(1) The m eting shall occur by the end of January of each c lendar year. <br />(2) At ndees shall include all carriers and tower companies wh have either filed <br />/plications the previous year or anyone who has expressed %prevent in filing <br />an application to construct a telecommunication support facilit County. <br />(3 The County shall notify each party of the date, time, and placeting no <br />later than 30 days prior to the meeting. <br />(4) Those individuals /firms intent on submitting development appe <br />expected to attend the meeting. While a lack of attendance went t submittal of an application, it will prevent the appli cant's ability ate in <br />the discussions outlining the areas of concentration for the location of <br />13 Since the dates for public hearings may change from year to year if the public hearing process change <br />amendments are adopted, it is not possible to pinpoint a date for hearings. Therefore, staff is suggesting that any <br />entity that would like to modify the Master Telecom Plan be permitted to apply for any of the public hearing dates <br />where UDO /Comprehensive Plan items can be considered. <br />Orange County, North Carolina — Unified Development Ordinance Page 5 -81 <br />A 11 ., <br />
The URL can be used to link to this page
Your browser does not support the video tag.