Browse
Search
1995 S Purchasing - Quality Construction of Danville, Inc. $713,629
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
1990's
>
1995
>
1995 S Purchasing - Quality Construction of Danville, Inc. $713,629
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2014 8:38:14 AM
Creation date
8/29/2014 2:25:58 PM
Metadata
Fields
Template:
BOCC
Date
2/21/1995
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
IX-C
Document Relationships
Agenda - 02-21-1995 - IX-C
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\1990's\1995\Agenda - 02-21-95
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
^ <br /> ^ ` � ^ <br /> Bond shall be construed asa statutory bond and not asa Construction Contract, architectural and engineering <br /> common law bond. semioe required for performance of the work of the <br /> Contractor and the Contractor's subcontractors, and <br /> 14 Upon request by any person or entity appearing tobea ail other items for which a mechanic's lien maybe <br /> potential beneficiary of this Bond' the Contractor shall asserted in the jurisdiction where the labor, materials <br /> promptly furnish a copy nf this Bond or shall permit acopy o, equipment were furnished. <br /> »mbemade. <br /> 15,2 Construction Contract:The agreement between <br /> is DEFINITIONS the Owner and the Contractor identified on the sig- <br /> 15^1 Claimant: An individual or entity having adirect nature page, including all Contract Documents and <br /> contract with the Contractor or with a subcontractor o/ changes thereto. <br /> the Contractor to furnish |abor, materials or equip' 15^3 Owner Default: Failure of the Owner.which has <br /> ment for use in the performance uf the Contract. The neither been remedied nor waived, to pay the Con- <br /> intent of this Bond shall beto include without |imitu' tractor as required bythe[mnstruchon [ont,actorto <br /> dmnin the terms^labor' ma»eha)sorequ�ment^that perform complete or comply with the other terms <br /> part of water, gas. power, light, heat' oil, gasoline, ,—thereof. <br /> telephone service or rental equipment used inthe <br /> ' <br /> MODIFICATIONS TO THIS BOND ARE AGFOLLOWS: <br /> (Space is provided below for additional signatures of added parties, other than those appearing on the cover page.) <br /> CONTRACTOR AS PRINCIPAL SURETY <br /> Company: (Corporate Seal) Company: (Corporate Seal) <br /> Signature: Signature: <br /> Name and Title: Name and Title: <br /> Address: Address: <br /> AIA DOCUMENT A312-PERFORMANCE BOND AND PAYMENT BOND -DECEMBER 1984 ED, -AIA 9 <br /> THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE_ N.W., WASHINGTON, D.C.200M A312-19M 6 <br /> THIRD PRINTING 0 MARCH 1987 <br />
The URL can be used to link to this page
Your browser does not support the video tag.