Orange County NC Website
ORIGINAL SIGNATURES <br /> CONSTRUCTION CONTRACT COPY W - 4 <br /> DIST: <br /> ,6k nick 61 a,,j o-,,z <br /> THIS AGRMCENT, made the in the year of 1995 by and between <br /> Sparrow& Sons, Inc., 305 Weaver Street Camboro, NC 27510, hereinafter called the Party of the First <br /> Part and the County of Orange,North Carolina,hereinafter called the Party of the Second Part. <br /> WITNESSETH: <br /> That the Party of the First Part and the Party of the Second Part for the consideration herein named <br /> agree as follows: <br /> 1. Scope of Work: The Party of the First Part shall furnish and deliver all of the materials, and perform <br /> all of the work in the manner and form as provided by the following enumerated plans,specifications and <br /> documents, which are attached hereto and made a part thereof as if fully contained herein: Advertise- <br /> ment, Instructions to Bidders, General Conditions, Supplementary General Conditions, Specifications, <br /> Accepted Proposal, Contract, Performance Bond, Payment Bond, Power of Attorney, Workmen's <br /> Compensation, Public Liability, Property Damage and Builder's Risk Insurance Certificates, and <br /> drawings,entitled: Orange County Public Works-New Vehicle Maintenance Facffi--M consisting of <br /> the following sheets. Cover, C1, C2, C& C4, Al. A2,A—&A4, A5,AQ,A7,A& S1, S2, S3, SC S5, S6,HI, <br /> H2,P1,P2,P3,El,E2,E3,E4,F1,and F2 dated-December 1. 1994 and the follow- <br /> ing addenda.- <br /> Addendum No. I Dated 1/6/95 Addendum No. Dated <br /> Addendum No _Dated Addendum No. Dated <br /> 2. That the Party of the First Part shall commence work to be performed under this Agreement on a <br /> date to be specified in a written order of the Party of the Second Part and shall fully complete all work <br /> hereunder within 300 consecutive calendar days from said date. For each day in excess thereof <br /> liquidated damages shall be as stated in Supplementary General Conditions. The Party of the First Part, <br /> as one of the considerations for the awarding of this Contract, shall furnish to the Party of the Second <br /> Part a construction schedule setting forth planned progress of the project broken down by the various di- <br /> visions or parts of the work and by calendar days. In the event that the progress of the work is not main- <br /> tamed on schedule by the Party of the First Part, or in the event the work is not completed within the <br /> time above specified,the Party of the Second Part may upon fifteen (15) days notice, sent certified mad, <br /> return receipt requested, to the Party of the First Part and his Sure&y. declare this Contract in default, <br /> and, thereupon, such Surety shall promptly take over said work and complete the performance of this <br /> Contract in the manner and within the time above specified, and all funds due or to become due to the <br /> Party of the First Part shall be paid to the Surety. In the event the Surety shall fail to take over the work <br /> to be done under this Contract within fifteen (15) days after being so notified and notify the Party of the <br /> Second Part in writing, sent by certified mad, return receipt requested,that he is taking the same over <br /> and stating that he will diligently pursue and complete the same,the Party of the Second Part shall have <br /> the right to let the work remaining to be done to some other Contractor, either by public letting or <br /> negotiation,and thereupon the Party of the First Part,the Contractor,and the Surety on his Bond shall <br /> forthwith pay the Party of the Second Part all increase in cost or loss and damage which it may sustain <br /> on account of such default on the part of the Party of the First Part. <br /> CONSTRUCTION CONTRACT-Page 1 of 3 <br />