Browse
Search
1995 S Purchasing - Comfort Engineers - Contract for Public Works Maintenance
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
1990's
>
1995
>
1995 S Purchasing - Comfort Engineers - Contract for Public Works Maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2014 12:53:54 PM
Creation date
8/29/2014 12:42:23 PM
Metadata
Fields
Template:
BOCC
Date
2/21/1995
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
IX-C
Document Relationships
Agenda - 02-21-1995 - IX-D
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\1990's\1995\Agenda - 02-21-95
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MERRITT CONSUL ENGR 919 929 6610 P. 06 <br /> ARTICLE 6 <br /> FINAL PAYMENT <br /> Final payment,constituting the entire unpaid balance of the Contract <br /> Surn,Shall be made by the Owner to the Contractor when(1) <br /> the Contract has been fully performed by the Contractor except for the Contractor'S responsibility to correct nonconforming <br /> Work as provided in Subparagraph 12.2.2 of the Gcncral Conditions and to satisfy other rcqkiiremcnts, if any, which nccessarily <br /> survive final payment and(2)a final Certificate for Payment has been issued by the Architect;such final payment shall 1w matte;by <br /> the owner riot more than 30 days after the issuance of the Archi(CCE'.- final Certificate for Payment. or as follows: <br /> ARTICLE 7 <br /> MISCELLANEOUS PROVISIONS <br /> 7.1 Where reference is made in this Agreement to a provision of the General Conditions or another Contract Document,the ref- <br /> erence refers to that provision as amended or supplemented by other provisions of the Contract T)ocuriienrs. <br /> 7.2 Payments due and unpaid under the Contract shall bear interest from the dace paymcnE is chic at the rate suacd below,or in <br /> the absence thereof, at the legal race prevailing from time to time at the place -here the Project is loc;ttcrl. <br /> (Inxert rafv,.f incemo agreed upon. i <br /> ,f arty.) <br /> (v.jury trays ana requirements under rbto Freleral Trua,in I.widing Aci,similarstau-and IrAwl c,nsi...ro'ervdif Imes anel"r&"'"t.,qukifirons(it 11'k.Ou"I(It's'pid <br /> 66miracro,'s principal places-/tnsinex.v,the 1,uwtion r The project and aff"C't I&I rcdf(lifj�"I 1()1s/)"n i.,lon t:Rail(1,114(v Wn'I'l(I I),•obstn'tt'd <br /> it-fib respLect if)dulaitan.,o"mrn;fifiedhrons' and also regardi'19 4a if riff en afsd'xwfrea(,*,14'afives.) <br /> 7.3 Other provisions: <br /> ARTICLE 8 <br /> TERMINATION OR SUSPENSION <br /> 8.1 The Contract may be terminated by the owner or the Contractor as pruvidcd in Article 14 of the Ocnci-al Condition,-. <br /> 8.2 The work may be suspended by the Owner as provided in Article 14 of the Gcncral Conditions. <br /> Ath DOCUMENT A101 • OWNER-CONTRACTOR AGREEMENT • TwEt,vrti EDITION• AIAT • Q 19?t7 <br /> THE AMERICAN INSTITUTE OF ARVITTECTS,F)15 NE-YORK AVENUE,Nxv-WASHtNGTON.D.c.2W06 A101-1987 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.