1995 S Purchasing - Comfort Engineers - Contract for Public Works Maintenance
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
1990's
>
1995
>
1995 S Purchasing - Comfort Engineers - Contract for Public Works Maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2014 12:53:54 PM
Creation date
8/29/2014 12:42:23 PM
Metadata
Fields
Template:
BOCC
Date
2/21/1995
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
IX-C
Document Relationships
Agenda - 02-21-1995 - IX-D
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\1990's\1995\Agenda - 02-21-95
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
+ MERRITT CONSUL ENGIR 919 929 6610 P. 05 <br /> ARTICLE 5 <br /> PROGRESS PAYMENTS <br /> 5.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by The <br /> Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and <br /> elsewhere in the Contract Documents. <br /> 5.2 The period covcred by each Application for Payment shall be one calendar month ending on the last day of the month,or as <br /> follows: <br /> 5.3 Provided an Application for Payment i5 received by the Architect not later than the twenty-fifth <br /> day of a month,the Owner shall make payment to the Contractor not later than <br /> the fifteenth day of the f 0110WJ?Wnth.If an Application for P4ytncnt 15 received by the <br /> Architect after the application date fixed above,payment shall be made by the Owner not later than 'GW@rity <br /> days after the Architect receives the Application for Payment. <br /> 5,4 Each Application for Payment shall be based upon the schedule of valucs submitted by the Contractor in accordance with <br /> the Contract Documents.The schedule of values shall allocate the entire Contract Sum among the various portions of the Work <br /> and be prepared in such form and supported by such data to substantiate its accuracy at the Architect may require.This schedule, <br /> unless objected to by the Architect,shall be used as a basis for reviewing the Contrictor's Applications for Riymcnt. <br /> 5.5 Applications for Payment shall indicate the percentage of completion of each portion of the Work as of the ctld of the period <br /> covered by the Application for Payment. <br /> 5.6 Subject to the provisions of the Contract Documents,the amount of cacti progress payment shall he computed as follows: <br /> 5.6.1. Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying file percentage <br /> completion of each portion of the Work by the share of the total Contract Sum allocated to that portion of the Work in the schedule <br /> of valu s less retainage of ten Ixrccnt <br /> ( 10 %).Pcndinlg final derermination of cost to the Owner of changes in the Work,amounts net In the dispute may be <br /> included as provided in Subparagraph 7.3,7 of the General Conditions even though the Contract Sum has not yet been adjusted <br /> by Change Order; <br /> 5.6.2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the <br /> site for substgltent incorporation in the completed construction(or,if approved in advance by the Owner,suitably stored off the <br /> Site at a location agreed upon in writing),less rctainage of ten <br /> percent( 10 %); <br /> 5.6.3 Subtract the aggregate of previous payments made by the Owner;and <br /> 5.6.4 Subtract amounts, if any, for which the Architect has withheld or nullified i Certificate for Payment as provided in Pari- <br /> graph 9.5 of the General Conditions, <br /> 5.7 The progress payment amount determined in accordance with Paragraph 5.6 shall be further modified under tine following <br /> circumstances! <br /> 5.7.1 Add, upon Substantial Completion of the Work.a sum sufficient to increase the total payments to <br /> One Hundred percent( 100 "/,)of the Contract <br /> Sum. less such amounts as the Architect shrill determine for incomplete Work and unsettled claims:anti <br /> 5.7.2 Add, if final completion of the Work is thereafter materially delayed through no fault of the contractor, any additional <br /> amounts payable in accordanct: with Subparagraph 9.103 of the General Conditions. <br /> 5.6 Reduction or limitation of rctainage, if any. shall be as follows; <br /> el(it is uttendret.Jim,,t.,Stibstc-liut 6'rnplella't of TGc vnrlry Work. It,reduc8 Or ttntit the•rtltut•14 r/a+t+/li,rg f'rv,ttr rlr+.hcna vru,l c•,,inserted rn.itr!>Irrucr <br /> graph.. 5.6.1 and 5,6.2 elb(We. cult this it'tilt fXPIWttcJ riseu'hrrc ix tiie C:ontratit Documents. insert berr(rr,t'ttfvas,J2rr,+'utlr rrdliitir'n ar'tr,rrirrztirnt.I <br /> AfA DOCUME=NT A101 • OWNER-CONTRACTOR AGttE•EMENT • TWELFTH EDITION •AIA® • ©1987 A101-1967 4 <br /> 1-TIE AMERICAN INS-11T11TE OF ARCHITECTS,1755 NEW YORK AWNvii,N.W.,WASHiNt:TON,D.C.2UCX "i <br />