1 <br /> ORANGE COUNTY <br /> BOARD OF-COMMISSIONERS <br /> Action Agenda <br /> Item No. _D <br /> ACTION AGENDA ITEM ABSTRACT <br /> Meeting Date: February 21, 1995 <br /> SUBJECT: BID AWARD/CONTRACT APPROVAL;CHILLER UNIT AT NEW COURTHOUSE <br /> DEPARTMENT:PURCHASING AND CENTRAL SERVICES PUBLIC HEARING:YES: NO: <br /> ATTACHMENT(S): INFORMATION CONTACT: <br /> PAM JONES, ext.2650 <br /> Bid Tabulation <br /> Telephone Number- <br /> Hillsborough 732-8181 <br /> Chapel Hill 967-9251 <br /> Mebane 227-2031 <br /> Durham 688-7331 <br /> PURPOSE: To consider awarding a bid and approving a contract,contingent upon Attorney and Staff review, <br /> for a new chiller system to be provided and installed at the New Courthouse. <br /> BACKGROUND: During the Summer, 1994 the existing chiller system at the New Courthouse experienced <br /> significant maintenance problems. One compressor is completely non-functional,thereby causing the system <br /> to operate at one-half capacity. Investigation revealed that the system is obsolete and cannot be repaired. <br /> it is our understanding that this system Is original to the building,built in 1953. Specifications were prepared <br /> by Gary Merritt,consulting engineer,and bids were solicited to replace the chiller system. The result of the bid <br /> Is attached. <br /> Since it is important to install the system during a period of time when minimal heat and cooling is required for <br /> the building we are requesting that the Board both award the bid and approve the contract,contingent upon the <br /> appropriate reviews. This witl expedite the process and ensure that the system is installed in time for the 1995 <br /> cooling season. Partial funding for this work was included in the 19941999 CIP,the balance of the project <br /> funding is recommended in the 1995-2000 CIP. In order to be able to complete this work in the time frame <br /> required,it is recommended that other line items within the New Courthouse Project account be realigned to <br /> cover the amount anticipated through the 1995 CIP. Those funds would be replaced through the 1995-2000 <br /> CIP. <br /> RECOMMENDATION: The Manager recommends that the Board award a bid to Comfort Engineers for <br /> replacement of the chiller system at the New Courthouse for a sum of$104,490 and approve a contract in this <br /> amount,contingent upon staff and Attorney review;and authorize the Chair to sign on behalf of the Board. <br />