Browse
Search
Agenda - 02-21-1995 - IX-D
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1995
>
Agenda - 02-21-95
>
Agenda - 02-21-1995 - IX-D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2014 11:21:47 AM
Creation date
8/29/2014 11:21:46 AM
Metadata
Fields
Template:
BOCC
Date
2/21/1995
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
IX-D
Document Relationships
1995 S Purchasing - Comfort Engineers - Contract for Public Works Maintenance
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\1990's\1995
Minutes - 19950221
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> ORANGE COUNTY <br /> BOARD OF-COMMISSIONERS <br /> Action Agenda <br /> Item No. _D <br /> ACTION AGENDA ITEM ABSTRACT <br /> Meeting Date: February 21, 1995 <br /> SUBJECT: BID AWARD/CONTRACT APPROVAL;CHILLER UNIT AT NEW COURTHOUSE <br /> DEPARTMENT:PURCHASING AND CENTRAL SERVICES PUBLIC HEARING:YES: NO: <br /> ATTACHMENT(S): INFORMATION CONTACT: <br /> PAM JONES, ext.2650 <br /> Bid Tabulation <br /> Telephone Number- <br /> Hillsborough 732-8181 <br /> Chapel Hill 967-9251 <br /> Mebane 227-2031 <br /> Durham 688-7331 <br /> PURPOSE: To consider awarding a bid and approving a contract,contingent upon Attorney and Staff review, <br /> for a new chiller system to be provided and installed at the New Courthouse. <br /> BACKGROUND: During the Summer, 1994 the existing chiller system at the New Courthouse experienced <br /> significant maintenance problems. One compressor is completely non-functional,thereby causing the system <br /> to operate at one-half capacity. Investigation revealed that the system is obsolete and cannot be repaired. <br /> it is our understanding that this system Is original to the building,built in 1953. Specifications were prepared <br /> by Gary Merritt,consulting engineer,and bids were solicited to replace the chiller system. The result of the bid <br /> Is attached. <br /> Since it is important to install the system during a period of time when minimal heat and cooling is required for <br /> the building we are requesting that the Board both award the bid and approve the contract,contingent upon the <br /> appropriate reviews. This witl expedite the process and ensure that the system is installed in time for the 1995 <br /> cooling season. Partial funding for this work was included in the 19941999 CIP,the balance of the project <br /> funding is recommended in the 1995-2000 CIP. In order to be able to complete this work in the time frame <br /> required,it is recommended that other line items within the New Courthouse Project account be realigned to <br /> cover the amount anticipated through the 1995 CIP. Those funds would be replaced through the 1995-2000 <br /> CIP. <br /> RECOMMENDATION: The Manager recommends that the Board award a bid to Comfort Engineers for <br /> replacement of the chiller system at the New Courthouse for a sum of$104,490 and approve a contract in this <br /> amount,contingent upon staff and Attorney review;and authorize the Chair to sign on behalf of the Board. <br />
The URL can be used to link to this page
Your browser does not support the video tag.