Browse
Search
Agenda - 01-17-1995 - VIII-C
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1995
>
Agenda - 01-17-95
>
Agenda - 01-17-1995 - VIII-C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2014 9:30:51 AM
Creation date
8/26/2014 9:30:42 AM
Metadata
Fields
Template:
BOCC
Date
1/17/1995
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
VIII-C
Document Relationships
Minutes - 19950117
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> Phase rV of Orange County's historic preservation program is the preparation of the Historic Preservation <br /> Element of the Comprehensive Plan. This project, which will begin in January, 1995, is being funded by a 1994 <br /> survey and planning grant of$10,315. The Jaeger Company of Gainesville,Georgia,will prepare the preservation <br /> plan. <br /> PROPOSAL <br /> Part One of the proposed project will be the completion of Phase II Survey fieldwork. In addition,existing <br /> inventory files will be reviewed and evaluated to determine if additional historical research is needed, and file <br /> narratives will be edited as needed. The estimated cost of Part One is$6,975,including grant funds,and cash and <br /> in-kind match. <br /> Part Two of the proposed project will be preparation of the Orange County Architectural and Historical <br /> Inventory Manuscript. Completion of the manuscript will involve developing an overview essay, incorporating <br /> additional research as needed,and assimilating the findings of Phase I(Chapel Hill Township),Phase II(remaining <br /> townships), and Phase III (archaeological survey) to produce the final drah. The consultant will also be charged <br /> with selecting and photographing the properties to be represented in the manuscript publication. The estimated <br /> cost of Part Two is$11,875, including grant funds, and cash and in-kind match. <br />
The URL can be used to link to this page
Your browser does not support the video tag.