Orange County NC Website
~~® <br />DRAFT -CONDITIONS OF APPROVAL - BUCKHORN VILLAGE May 7, 2008 <br />the County's Solid Waste staff. This may be the same meeting held j <br />with other development officials' l <br />i. In cases where waste collection areas are located across property lines or district <br />lines for shared areas, the developer shall prepare and record a joint access <br />agreement (and a shared dumpster agreement) to assure that (both parties may <br />use) the proposed trash/recycling area and that it can be serviced across property <br />lines. <br />j. The developer shall reserve space within all solid waste collection areas for <br />segregated grease rendering/recycling collection facilities and shall provide space <br />for segregated food waste collection near the delivery entrance for any building <br />that houses, proposes.. to include, or may at some future date incorporate a <br />restaurant, cafeteria,. bar, or other food service facility at any time. <br />k. The developer shall ensure that all phases of the development shall comply with <br />House Bill 1518 (ABC Recycling) (NCGS 18B) for .all portions of the <br />development, which contain or may contain establishments requiring an ABC <br />License. <br />1. A note shall be required on all site plans reading as .follows: `The burning or <br />burial of construction debris, trees, limbs, stumps, is prohibited.' <br />m. All solid waste containers, dumpsters, recycling bins, etc. shall be located within <br />an enclosure, buffered in accordance with the standards contained herein, and <br />meeting the following criteria: <br />i. Loading areas shall only face side or rear property lines, `- <br />ii. Solid waste enclosures shall be so located as to not impact internal <br />traffic flow, <br />iii. Loading zoned shall not be located within areas designated as housing <br />for solid waste facilities. <br />7. EROSION CONTROL. The following standards shall be observed with respect to <br />.grading and erosion control activities:. <br />a. The developer shall cause a formal Erosion Control plan (ECP) to be prepared <br />and submitted for review and approval by the County Erosion Control <br />Department prior to the commencement of any earth disturbing activities, <br />b. State of the art skimmer basins designed to meet or exceed the requirements in the <br />North Carolina Erosion and Sediment Control Planning and Design Manual (July <br />2006) must be utilized to control sedimentation during construction. <br />i. Floating skimmers, such as Faircloth skimmers or equivalent, must be <br />utilized in each basin. <br />ii. Skimmers must dewater from the surface within 24 to 72 hours, and the <br />orifice size of the skimmer must be correctly sized to obtain the <br />appropriate discharge rate. <br />\, <br />