Browse
Search
Agenda - 06-03-2008-5b5e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 06-03-2008
>
Agenda - 06-03-2008-5b5e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 8:50:03 AM
Creation date
8/28/2008 9:14:39 AM
Metadata
Fields
Template:
BOCC
Date
6/3/2008
Document Type
Agenda
Agenda Item
5b5e
Document Relationships
Minutes - 20080603
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ <br />DRAFT -CONDITIONS OF APPROVAL - BUCKHORN VILLAGE May 7, 2008 <br />b. The developer shall demonstrate compliance with the Orange County Regulated <br />Recyclable Materials Ordinance (RRMO) regardless of permitting jurisdiction <br />(Chapter 34 Article III of the Orange County Code of Ordinances), <br />c. The applicant shall develop a Solid Waste Management Plan for each portion of <br />the project for review and approval by Orange County Solid Waste (regardless of <br />permitting jurisdiction) for the life of the project. <br />Specifically, this plan shall address how land clearing, demolition, and <br />construction wastes will be disposed of and that recyclables and waste generation <br />rates be considered in planning for waste collection services regardless of waste <br />or recycling provider, <br />d. Prior to the commencement of earth disturbing activities on the property, the <br />developer shall hold a deconstruction assessment meeting with Orange County <br />staff concerning the removal of existing buildings from the property.. <br />e. All site plans shall contain a note indicating the following:: "Prior to any <br />demolition or construction activity on the site the applicant will hold a <br />deconstruction assessment conference with the County's Solid Waste staff <br />concerning buildings to be removed from this site." . <br />f. The applicant shall provide both internal and external space for collection of solid <br />waste and recyclable materials. Materials .collected shall be at least equivalent to <br />the services provided by Orange County Solid Waste. <br />g. Waste collection areas shall be located in such a manner as to provide convenient <br />access for users of the facility and safe passage for service vehicles. <br />h. The developer shall be required to place the following additional notes on any <br />approved site plan: <br />i. `Any gate design will include gate retainers.' <br />ii. `The user will be responsible for opening gates to the dumpster area on <br />collection days of any material(s) to be collected from this location.' <br />iii. `If any vehicles are parked in the refuse or recyclables collection <br />vehicle access area, the containers will not receive service until the <br />next scheduled collection day.' <br />iv. `Orange County will not be responsible for any pavement damage that <br />,may result from service vehicles.' <br />v. `By Orange County Ordinance, clean wood waste, scrap metal and <br />corrugated cardboard, all present in construction waste, must be <br />recycled. ` <br />vi. `By Orange County Ordinance, all haulers of construction waste must <br />be properly licensed.' And <br />vii. `Prior to any demolition or construction activity o~ the site the <br />applicant will hold apre-demolition/pre-construction conference with <br />
The URL can be used to link to this page
Your browser does not support the video tag.