Browse
Search
Agenda - 06-03-2008-5b5e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 06-03-2008
>
Agenda - 06-03-2008-5b5e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 8:50:03 AM
Creation date
8/28/2008 9:14:39 AM
Metadata
Fields
Template:
BOCC
Date
6/3/2008
Document Type
Agenda
Agenda Item
5b5e
Document Relationships
Minutes - 20080603
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLANNING BOARD ACTION -SUP APPLICATION: <br />As the Board is akeady aware, this application has both a legislative rezoning request and aquasi- <br />judicial Special Use Permit component. The Special Use Permit portion of this project will be <br />discussed once there is a recommendation on the rezoning petition. <br />As the Board is akeady aware, within a quasi judicial process written findings of fact are required. <br />The Board making the decision must explicitly set forth what it determines to be the essential facts <br />that it is basing its decision on and must also make specific findings of fact and provide specific <br />detail to inform all parties, and a reviewing court, as to what induced the decision. It needs to be <br />remembered that a conclusory statement that a standard has, or has not, been met is insufficient. <br />ARTICLE EIGHT (8): <br />In reviewing this portion of the project, the Planning Board will be asked to begin making <br />recommendations on the issuance of the Class A Special Use Pernvt in accordance with the <br />provisions of Article Eight (8). <br />.ARTICLE SEVEN (7) -SECTION 7.5.4: <br />In. additional to the provisions of Article Eight ($), Section 7.5.4, specifically subsections (d) and (e), <br />will be part of the Special Use Permit review process as they relate to the proposed design solutions <br />and conditions of approval for the project. As a reminder, subsections (d) and (e) of Section 7.5.4 <br />;' read as follows: <br />(d) As to tlae suitability of plans proposed or the desirability of amendments; and <br />(e) As to the adherence to PD or general regulations w~ as to desirable specific modifications in <br />PD or general regulations as applied to the particular case, based on determination that <br />such modifications are necessafy or justified in the particular case by demonstration that tlae <br />public purposes of PD or other regulations would be naet to at Zeast an equivalent degree by <br />such modifications. <br />STAFF COMMENT: <br />In accordance with Article Eight (8) and Section 7.5.4 of the Ordinance, staff will be supplying the <br />Board with the typical Class A SUP Findings of Fact document once there has been additional <br />review and discussion of staff's recommendation by the Planning Board. <br />51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.