Orange County NC Website
ATTACHMENT ONE (1) REQUEST AND REVIEW PROCESS SUMMARY: ~"~1 <br />CONTINUED: Article Eight (8) Special Use Permits, specifically the review and approval <br /> procedures outlined within Sections 8.1 through 8.7.3 as well as the <br /> following specific Standards of Approval: <br /> 8.8.23 Planned Developments <br /> 8.8.23.1 Additionallnformation <br /> In addition to the information required in Subsections 8.2 <br /> and. 8.8, information shall be supplied as part of the <br /> application as per applicable requirements of Article 7. <br /> 8.8.23.2 Standards of Evaluation <br /> The standards of evaluation shall be as per. applicable <br /> sections of Article 7. <br />CONTINUED: Article Twenty (20) Amendments, specifically referring to the standards <br /> governing Zoning Atlas Amendments <br />Attachment One -Page 5 <br />