2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 2. Contractor shall not be entitled to any adjustment in the Contract Price or Contract Times <br /> if <br /> ' a. Contractor knew of the existence of such conditions at the time Contractor made a final <br /> commitment to Owner with respect to Contract Price and Contract Times by the <br /> submission of a Bid or becoming bound under a negotiated contract;or <br /> ' b. the existence of such condition could reasonably have been discovered or revealed as a <br /> result of any examination, investigation, exploration, test, or study of the Site and <br /> ' contiguous areas required by the Bidding Requirements or Contract Documents to be <br /> conducted by or for Contractor prior to Contractor's making such final commitment; or <br /> ' c. Contractor failed to give the written notice as required by Paragraph 4.03.A. <br /> 3. If Owner and Contractor are unable to agree on entitlement to or on the amount or extent, <br /> ' if any, of any adjustment in the Contract Price or Contract Times, or both, a Claim may be <br /> made therefor as provided in Paragraph 10.05. However, neither Owner or Engineer, or <br /> any of their officers, directors, members, partners, employees, agents, consultants, or <br /> subcontractors shall be liable to Contractor for any consequential damages, including but <br /> not limited to claims, costs, losses, or damages (including but not limited to all fees and <br /> charges of engineers, architects, attorneys, and other professionals and all court or <br /> ' arbitration or other dispute resolution costs) sustained by Contractor on or in connection <br /> with any other project or anticipated project, and Contractor expressly and specifically <br /> releases any and all damages related thereto. Any damages for suspension or idle time <br /> shall be limited to the Contractor's actual cost of labor or equipment costs, including a <br /> reasonable markup for overhead but shall not include a markup for profit. <br /> ' 4.04 Underground Facilities <br /> A. Shown or Indicated: The information and data shown or indicated in the Contract Documents <br /> ' with respect to existing Underground Facilities at or contiguous to the Site is based on <br /> information and data furnished to Owner or Engineer by the owners of such Underground <br /> Facilities, including Owner, or by others. Unless it is otherwise expressly provided in the <br /> ' Contract Documents: <br /> 1. Owner and Engineer shall not be responsible for the accuracy or completeness of any such <br /> ' information or data provided; and <br /> 2. the cost of all of the following will be included in the Contract Price, and Contractor shall <br /> ' have full responsibility for: <br /> a. reviewing and checking all such information and data; <br /> ' b. locating all Underground Facilities shown or indicated in the Contract Documents; <br /> c. coordination of the Work with the owners of such Underground Facilities, including <br /> Owner,during construction; and <br /> ' EJCDC C-700 Modified Standard General Conditions of the Construction Contract <br /> Copyright©2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> Page 15 of 81 <br />