Orange County NC Website
B. Resolving Discrepancies: <br /> 1. Except as may be otherwise specifically stated in the Contract Documents, the provisions <br /> of the Contract Documents shall take precedence in resolving any conflict, error, <br /> ambiguity, or discrepancy between the provisions of the Contract Documents and: <br /> a. the provisions of any standard, specification, manual, or code, or the instruction of any <br /> Supplier (whether or not specifically incorporated by reference in the Contract <br /> Documents); or <br /> b. The provisions of any Laws or Regulations applicable to the performance of the Work <br /> (unless such an interpretation of the provisions of the Contract Documents would result <br /> in violation of such Law or Regulation). <br /> 3.04 Amending and Supplementing Contract Documents <br /> A. The Contract Documents may be amended to provide for additions, deletions, and revisions in <br /> the Work or to modify the terms and conditions thereof by either a Change Order or a Work <br /> Change Directive. <br /> B. The requirements of the Contract Documents may be supplemented, and minor variations and <br /> deviations in the Work may be authorized,by one or more of the following ways: <br /> 1. A Field Order; <br /> 2. Engineer's approval of a Shop Drawing or Sample(subject to the provisions of Paragraph <br /> 6.17.D.3);or <br /> 3. Engineer's written interpretation or clarification. <br /> 3.05 Reuse of Documents <br /> A. Contractor and any Subcontractor or Supplier shall not: <br /> 1. have or acquire any title to or ownership rights in any of the Drawings, Specifications, or <br /> other documents (or copies of any thereof)prepared by or bearing the seal of Engineer or <br /> its consultants,including electronic media editions; or <br /> 2. reuse any such Drawings, Specifications,other documents, or copies thereof on extensions <br /> of the Project or any other project without written consent of Owner and Engineer and <br /> specific written verification or adaptation of such documents by Engineer. <br /> B. The prohibitions of this Paragraph 3.05 will survive final payment, or termination of the <br /> Contract. Nothing herein shall preclude Contractor from retaining copies of the Contract <br /> Documents for ordinary record keeping purposes. <br /> C. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify,defend, and <br /> hold harmless Engineer, and the Owner and their employees, principals, agents, successors, <br /> insurers, sureties and assigns, from and against any and all liabilities, claims, causes of actions, <br /> suits of any nature, fines, penalties, expenses, costs, losses, and damages (including but not <br /> EJCDC C-700 Modified Standard General Conditions of the Construction Contract <br /> Copyright(D 2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> Page 11 of 81 <br />