Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
authority to undertake responsibility contrary to the provisions of Paragraph 9.09 or any ' <br /> other provision of the Contract Documents. <br /> C. Day: <br /> 1. The word"day"means a calendar day of 24 hours measured from midnight to the next <br /> midnight. ' <br /> D. Defective: <br /> 1. The word"defective,"when modifying the word"Work,"refers to Work that is ' <br /> unsatisfactory, faulty,or deficient in that it: <br /> a. does not conform to the Contract Documents or general standards of workmanlike ' <br /> construction or published authorities which govern the proper use and application of a <br /> particular material or component, including but not limited to literature published by <br /> manufacturers and trade organizations; or , <br /> b. does not meet the requirements of any applicable inspection,reference standard,test, or <br /> approval referred to in the Contract Documents; or ' <br /> c. has been damaged prior to Engineer's recommendation of final payment(unless <br /> responsibility for the protection thereof has been assumed by Owner at Substantial ' <br /> Completion in accordance with Paragraph 14.04 or 14.05). <br /> E. Furnish, Install, Perform, Provide: ' <br /> 1. The word"furnish,"when used in connection with services,materials, or equipment, shall <br /> mean to supply and deliver said services,materials, or equipment to the Site(or some ' <br /> other specified location)ready for use or installation and in usable or operable condition. <br /> 2. The word"install,"when used in connection with services,materials, or equipment, shall ' <br /> mean to put into use or place in final position said services,materials,or equipment <br /> complete and ready for intended use. <br /> 3. The words"perform"or"provide,"when used in connection with services,materials, or ' <br /> equipment, shall mean to furnish and install said services,materials, or equipment <br /> complete and ready for intended use. ' <br /> 4. When"furnish,""install,""perform,"or"provide"is not used in connection with services, <br /> materials, or equipment in a context clearly requiring an obligation of Contractor, ' <br /> "provide"is implied. <br /> F. Unless stated otherwise in the Contract Documents,words or phrases that have a well-known ' <br /> technical or construction industry or trade meaning are used in the Contract Documents in <br /> accordance with such recognized meaning. <br /> EJCDC C-700 Modified Standard General Conditions of the Construction Contract ' <br /> Copyright©2007 National Society of Professional Engineers for EJCDC. Ali rights reserved. <br /> Page 6 of 81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.