levels,laboratory test results,and other factual, objective information regarding conditions <br /> at the Site that are set forth in any geotechnical or environmental report prepared for the <br /> Project and made available to Contractor are hereby defined as Technical Data with <br /> respect to conditions at the Site under Paragraphs 5.03, 5.04, and 5.06. <br /> 49. Underground Facilities—All underground pipelines, conduits,ducts, cables,wires, <br /> manholes,vaults,tanks,tunnels,or other such facilities or attachments, and any <br /> encasements containing such facilities,including those that convey electricity, gases, <br /> steam,liquid petroleum products,telephone or other communications, cable television, <br /> water,wastewater, storm water, other liquids or chemicals,or traffic or other control <br /> systems. <br /> 50. Unit Price Work—Work to be paid for on the basis of unit prices. <br /> 51. Work—the entire construction or the various separately identifiable parts thereof required <br /> to be provided under the Contract Documents.Work includes and is the result of <br /> performing or providing all labor,services, and documentation necessary to produce such <br /> construction,and fin-nishing,installing,and incorporating all materials and equipment into <br /> such construction, all as required by the Contract Documents. <br /> 52. Work Change Directive—A written statement to Contractor issued on or after the <br /> Effective Date of the Agreement and signed by Owner and recommended by Engineer <br /> ordering an addition,deletion,or revision in the Work,or responding to differing or <br /> unforeseen subsurface or physical conditions under which the Work is to be performed or <br /> to emergencies. A Work Change Directive will not change the Contract Price or the <br /> Contract Times but is evidence that the parties expect that the change ordered or <br /> documented by a Work Change Directive will be incorporated in a subsequently issued <br /> Change Order following negotiations by the parties as to its effect,if any,on the Contract <br /> Price or Contract Times. <br /> 1.02 Terminology <br /> A. The words and terms discussed in Paragraph 1.02.13 through F are not defined but,when used in <br /> the Bidding Requirements or Contract Documents,have the indicated meaning. <br /> B. Intent of Certain Terms or Adjectives: <br /> 1. The Contract Documents include the terms"as allowed,""as approved,""as ordered,""as <br /> directed"or terms of like effect or import to authorize an exercise of professional <br /> judgment by Engineer. In addition,the adjectives"reasonable,""suitable,""acceptable," <br /> "proper,""satisfactory,"or adjectives of like effect or import are used to describe an <br /> action or determination of Engineer as to the Work. It is intended that such exercise of <br /> professional judgment,action,or determination will be solely to evaluate,in general,the <br /> Work for compliance with the information in the Contract Documents and with the design <br /> concept of the Project as a functioning whole as shown or indicated in the Contract <br /> Documents(unless there is a specific statement indicating otherwise). The use of any such <br /> term or adjective is not intended to and shall not be effective to assign to Engineer any <br /> duty or authority to supervise or direct the performance of the Work, or any duty or <br /> EJCDC C-700 Modified Standard General Conditions of the Construction Contract <br /> Copyright 0 2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> Page 5 of 81 <br />