2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
38. Schedule of Submittals—a schedule, prepared and maintained by Contractor, of required <br /> submittals and the time requirements to support scheduled performance of related <br /> construction activities. <br /> 39. Schedule of Values—a schedule, prepared and maintained by Contractor, allocating <br /> portions of the Contract Price to various portions of the Work and used as the basis for <br /> reviewing Contractor's Applications for Payment. <br /> 40. Shop Drawings—All drawings, diagrams, illustrations, schedules, and other data or <br /> information which are specifically prepared or assembled by or for Contractor and <br /> submitted by Contractor to illustrate some portion of the Work. <br /> 41. Site—Lands or areas indicated in the Contract Documents as being furnished by Owner <br /> upon which the Work is to be performed, including rights-of-way and easements for <br /> access thereto, and such other lands furnished by Owner which are designated for the use <br /> of Contractor. <br /> 42. Specifications—That part of the Contract Documents consisting of written requirements <br /> for materials, equipment, systems, standards and workmanship as applied to the Work, <br /> and certain administrative requirements and procedural matters applicable thereto. <br /> 43. Subcontractor—an individual or entity having a direct contract with Contractor or with <br /> any other Subcontractor for the performance of a part of the Work at the Site. <br /> 44. Substantial Completion—The time at which the Work (or a specified part thereof) has <br /> progressed to the point where, in the opinion of Engineer, the Work (or a specified part <br /> thereof) is sufficiently complete, in accordance with the Contract Documents, so that the <br /> Work (or a specified part thereof) can be fully utilized for the purposes for which it is <br /> intended. As a precedent condition to Substantial Completion the Owner shall have <br /> received all certificates of occupancy and any other necessary permits for beneficial <br /> occupancy. The terms "substantially complete" and "substantially completed" as applied <br /> to all or part of the Work refer to Substantial Completion thereof. <br /> 45. Successful Bidder—the Bidder submitting a responsive Bid to whom Owner makes an <br /> award. <br /> 46. Supplementary Conditions that part of the Contract Documents which amends or <br /> supplements these Modified General Conditions. <br /> 47. Supplier—A manufacturer, fabricator, supplier, distributor, material man, or vendor <br /> having a direct contract with Contractor or with any Subcontractor to ftmjish materials or <br /> equipment to be incorporated in the Work by Contractor or Subcontractor. <br /> 48. Technical Data—Those items expressly identified as Technical Data in the <br /> Supplementary Conditions, with respect to either (a) subsurface conditions at the Site, or <br /> physical conditions relating to existing surface or subsurface structures at the Site(except <br /> Underground Facilities)or(b)Hazardous Environmental Conditions at the Site. If no such <br /> express identifications of Technical Data have been made with respect to conditions at the <br /> Site, then the data contained in boring logs, recorded measurements of subsurface water <br /> EJCDC C-700 Modified Standard General Conditions of the Construction Contract <br /> Copyright 0 2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> Page 4 of 81 <br />