Orange County NC Website
i 6. Modified General Conditions (pages 1 through 82, inclusive). ' <br /> 7. Supplementary Conditions (pages 0 through 0, inclusive). <br /> 8. Specifications as identified in the table of contents of the bound Project Manual. <br /> 9. Drawings consisting of 14 sheets with each sheet bearing the following general <br /> title: Morinaea America Foods,Inc. Facility Infrastructure Improvements ' <br /> 10. Addenda(numbers 1 through 2, inclusive). <br /> 11. Exhibits to this Agreement(enumerated as follows): ' <br /> a. Contractor's Bid (pages 1 through 8, inclusive). , <br /> 12. The following which may be delivered or issued on or after the Effective Date of <br /> the Agreement and are not attached hereto: ' <br /> a. Notice to Proceed (pages 1 through 1, inclusive). <br /> b. Work Change Directives. ' <br /> c. Change Orders. ' <br /> B. The documents listed in Paragraph 8.01.A are attached to this Agreement(except as <br /> expressly noted otherwise above). ' <br /> C. There are no Contract Documents other than those listed above in this Article 8. <br /> D. The Contract Documents may only be amended, modified, or supplemented as ' <br /> provided in Paragraph 3.04 of the General Conditions. <br /> EJCDC C-520 Modified Form of Agreement Between Owner and Contractor for Construction Contract(Stipulated Price) , <br /> Copyright©2007 National Society of Professional Engineers for EJCDC.All rights reserved. <br /> Page 6 of 7 ' <br />