Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i 6. Modified General Conditions (pages 1 through 82, inclusive). ' <br /> 7. Supplementary Conditions (pages 0 through 0, inclusive). <br /> 8. Specifications as identified in the table of contents of the bound Project Manual. <br /> 9. Drawings consisting of 14 sheets with each sheet bearing the following general <br /> title: Morinaea America Foods,Inc. Facility Infrastructure Improvements ' <br /> 10. Addenda(numbers 1 through 2, inclusive). <br /> 11. Exhibits to this Agreement(enumerated as follows): ' <br /> a. Contractor's Bid (pages 1 through 8, inclusive). , <br /> 12. The following which may be delivered or issued on or after the Effective Date of <br /> the Agreement and are not attached hereto: ' <br /> a. Notice to Proceed (pages 1 through 1, inclusive). <br /> b. Work Change Directives. ' <br /> c. Change Orders. ' <br /> B. The documents listed in Paragraph 8.01.A are attached to this Agreement(except as <br /> expressly noted otherwise above). ' <br /> C. There are no Contract Documents other than those listed above in this Article 8. <br /> D. The Contract Documents may only be amended, modified, or supplemented as ' <br /> provided in Paragraph 3.04 of the General Conditions. <br /> EJCDC C-520 Modified Form of Agreement Between Owner and Contractor for Construction Contract(Stipulated Price) , <br /> Copyright©2007 National Society of Professional Engineers for EJCDC.All rights reserved. <br /> Page 6 of 7 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.