Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 1. Prior to Substantial Completion, progress payments will be made in an amount <br /> equal to the percentage indicated below but, in each case, less the aggregate of <br /> payments previously made and less such amounts as Engineer may determine or <br /> ' Owner may withhold, including but not limited to liquidated damages, in <br /> accordance with Paragraph 14.02 of the General Conditions. <br /> a. 95 percent of Work completed (with the balance being retainage). If the Work <br /> has been 50 percent completed as determined by Engineer, and if the character <br /> and progress of the Work have been satisfactory to Owner and Engineer, then <br /> ' as long as the character and progress of the Work remain satisfactory to Owner <br /> and Engineer,there will be no additional retainage; and <br /> B. Upon Substantial Completion, Owner shall pay an amount sufficient to increase total <br /> ' payments to Contractor to 95 percent of the Work completed, less such amounts as <br /> Engineer shall determine in accordance with Paragraph 14.02.13.5 of the General <br /> ' Conditions and less 2_5 percent of Engineer's estimate of the value of Work to be <br /> completed or corrected as shown on the tentative list of items to be completed or <br /> corrected attached to the certificate of Substantial Completion. <br /> ' 5.03 Final Payment <br /> A. Upon final completion and acceptance of the Work in accordance with Paragraph 14.07 <br /> ' of the General Conditions, Owner shall pay the remainder of the Contract Price as <br /> recommended by Engineer as provided in said Paragraph 14.07. <br /> ' ARTICLE 6—CONTRACTOR'S REPRESENTATIONS <br /> ' 6.01 In order to induce Owner to enter into this Agreement, Contractor makes the following <br /> representations: <br /> A. Contractor has examined and carefully studied the Contract Documents and the other <br /> related data identified in the Bidding Documents. <br /> ' B. Contractor has visited the Site and become familiar with and is satisfied as to the <br /> general, local, and Site conditions that may affect cost, progress, and performance of <br /> the Work. <br /> ' C. Contractor is familiar with and is satisfied as to all federal, state, and local Laws and <br /> Regulations that may affect cost,progress, and performance of the Work. <br /> ' D. Contractor has reviewed all General and Supplementary Conditions applicable to the <br /> Work. <br /> E. Contractor has considered the information known to Contractor;information commonly <br /> known to contractors doing business in the locality of the Site; information and <br /> observations obtained from visits to the Site; the Contract Documents; and the Site- <br /> ' related reports and drawings identified in the Contract Documents, with respect to the <br /> effect of such information, observations, and documents on (1) the cost, progress, and <br /> performance of the Work; (2)the means, methods, techniques, sequences, and <br /> EJCDC C-520 Modified Form of Agreement Between Owner and Contractor for Construction Contract(Stipulated Price) <br /> Copyright©2007 National Society of Professional Engineers for EJCDC.All rights reserved. <br /> Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.