Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NC Department of Labor Inspection Number: 316777176 <br /> Division of Occupational Safety and Health Inspection Dates: 11/20/2012 - (�� <br /> Issuance Date: 05/16/2013 <br /> Citation and Notification of Penalty ' <br /> Company Name: J.F. Wilkerson Contracting Company, Inc. , <br /> Inspection Site: Main Campus and Achievement Drive, Raleigh, NC 27606 <br /> Citation 1 Item 1 Type of Violation: Serious ' <br /> 29 CFR 1926.651(k)(1): Daily inspections of excavations, the adjacent areas, and protective systems were not ' <br /> made by a competent person for evidence of a situation that could have resulted in possible cave-ins, indications <br /> of failure of protective systems, hazardous atmospheres, or other hazardous conditions. The competent person did <br /> not conduct inspections as needed throughout shift: ' <br /> a) Main Campus Drive and Achievement Drive (trench site at NCSU Centennial Campus) - on or ' <br /> about 11/20/12 the site foreman/competent person having seen the continued presence of water <br /> flowing inside the trench box and soil entering the trench box from the bottom, did not stop work <br /> and re-inspect to determine why the conditions were developing. An employee standing outside , <br /> trench was engulfed when soil underneath him collapsed. <br /> .....:. :. "Will' a ::::::� ::: . . <br /> < 'Q <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> See pages 1 through 6 of this Citation and Notification of Penalty for information on employer and employee rights and responsibilities. , <br /> Citation and Notification of Penalty Page 7 of 8 OSHA-2(Rev. 9/93) <br />
The URL can be used to link to this page
Your browser does not support the video tag.