Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' B. Excelsior Matting. Excelsior mattin g shall be installed at location shown on the <br /> ' Drawings and shall be in compliance with "Standards and Specifications for Soil Erosion <br /> and Sediment Control"by the Land Quality Section of NCDNER.. <br /> 9. Permanent Vegetative Cover. Upon completion and acceptance of the <br /> improvements outlined in the Phasing Program, the entire area disturbed by project <br /> construction shall be provided with a permanent vegetative cover. The disturbed areas <br /> shall be finely tilled by harrowing, followed by drag harrow. Yard areas shall be hand <br /> raked and all rocks shall be removed.Where soil conditions are unfavorable for successful <br /> ' establishment of cover, available topsoil shall be spread. Dolomitic Limestone shall be <br /> applied at the rate of 4,000 lbs., per acre and a 10-10-10 commercial fertilizer mix shall be <br /> applied at the rate of 1,000 lbs., per acre to the disturbed area. It shall be worked into the <br /> ' soil to a depth of 3 to 4 inches. Seed shall be uniformly applied to disturbed area <br /> according to the following schedule by broadcasting with a cyclone seeder or close drill. <br /> Seed shall be lightly covered and soil firmed. Straw mulch shall be applied to the seeded <br /> ' area at the rate of 1-1/2 bales per 1,000 sq. ft., and tacked. Tack shall conform to North <br /> Carolina Department of Transportation specifications and to Department of Transportation <br /> application rates. <br /> ' SCHEDULE FOR PROVIDING PERMANENT VEGETATIVE COVER <br /> PLANTING MONTHS PLANTS AND MIXTURES _APPLICATION RATES <br /> LBS/ACRE <br /> ' January, February, March,April, Tall Fescue 100 <br /> May, June, July, November, December & Rye Grain 50 <br /> ' August, September, October Tall Fescue 8 100 <br /> Sorghum-Sudan Hybrids 50 <br /> t The preceding permanent cover requirements pertain to all areas disturbed during the <br /> project construction including road shoulders, temporary access roads, spoil areas, <br /> building sites, rights-of-way, easements and line work. <br /> ' 29. Bonds and Permits Reauired by N. C. State Highway Commission. The Contractor, at his <br /> own expense, will secure from the N. C. State Highway Commission, the "Encroachment <br /> Agreement"required prior to the installation of that portion of this project that lies within the right <br /> ' of way of the said Commission. Any or all other bonds and/or permits required by the said <br /> Commission in connection with this project shall be provided and Paid for by the Contractor. <br /> This relates especially to the"Permit to Open Pavement"and the performance bond. <br /> 30. Guarantee. The Contractor shall guarantee that if any materials, equipment or <br /> workmanship covered by these Specifications and the accompanying Drawings proves <br /> defective within one year after final acceptance, such defects shall be made good by him. The <br /> ' Engineer shall provide a letter to the City indicating the start of the 12-month guarantee period. <br /> Provide State required certifications and "As Builts"with guarantee letter. <br /> ' 31. Manhole Testing. This section is to supplement the manhole specifications. All manholes <br /> shall be tested using either the exfiltration test or vacuum test as specified below. Manholes <br /> shall be tested by plugging the inlet and outlet lines with airtight plugs prior to performing the <br /> manhole test. <br /> t SANITARY SEWER LINES: DETAILED SPECIFICATIONS FOR INSTALLATION SS-13 <br /> 10/15/09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.