Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
encasement shall conform to the typical section shown on the drawings. Delivery tickets on the <br /> concrete thus shall be turned in to the Engineer no later than the following working day after <br /> delivery was made. <br /> 21. Cast Iron Soil Pipe Stacks. The cast iron soil pipe stacks shall be installed where shown on <br /> the Drawings and to material specifications as hereinbefore specified. <br /> The stack shall be installed as detailed on the Drawings. Care must be taken to properly tamp <br /> the earth around stack as the pipe is laid. ' <br /> The concrete pad is to be poured on undisturbed soil under the 114 bend to size as detailed on <br /> the Drawings. <br /> 22. Pipelines Under State Highway Pavement. Where shown on the Plans, or as directed by , <br /> the Engineer, cast iron sewer mains shall be installed under State Highway pavement by <br /> encasing in a larger pipe. The carrier pipe shall be of ductile iron and the encasement pipe shall ' <br /> be of steel. <br /> The encasement pipe shall be installed true to line and grade and in conformance with the <br /> requirements of the N. C. State Highway Commission. The size of the encasement and carrier <br /> pipes shall be as shown on the Drawings. <br /> Following the installation of the carrier pipe, the ends of the encasement pipe shall be suitably ' <br /> protected against the entrance of foreign material, but shall not be tightly sealed. In general, <br /> this may be accomplished by the use of the same stone specified for trench stabilization. The <br /> ductile iron carrier pipe shall extend approximately 5.0 feet beyond each end of the encasement <br /> pipe. <br /> Pipelines installed under this Section shall not be undertaken without the express approval of <br /> the appropriate N. C. State Highway Commission's Division Engineer. , <br /> 23. Pavement Replacement, All pavement cut and removed from publicly maintained roads, <br /> streets or highways as authorized by the City, shall be replaced by the Contractor. Pavement , <br /> cuts shall be maintained by the Contractor until such time as the pavement has been replaced, <br /> but such replacement shall be done as promptly as weather permits. Pavement shall be <br /> replaced within 46 hours after being cut. No pavement cuts are allowed on Friday. <br /> 24. Ex'stina Pipes. Conduits and Cables - Care of. Special care must be exercised by the <br /> Contractor, in the installation of all pipe and improvements, In passing under or over existing <br /> storm sewers, sanitary sewers, water lines, gas lines and telephone or power conduits or <br /> cables. All aforementioned pipes, cables, conduits, lines, and structures broken or ruptured by <br /> the Contractor must be immediately repaired or replaced by him. It shall be the contractor's <br /> responsibility to verify the location of all underground lines before construction. <br /> 25. Responsibility for Damages. The Contractor shall be held responsible for all damages <br /> claimed, as a result of the installation of this project, to all utility poles, driveways, yards, <br /> shrubbery and planting, drain ditches and pipes, pavement, sidewalks, water lines, gas lines, , <br /> telephone or power conduits or cables, buildings, fences, etc., and will be required to make <br /> satisfactory adjustment of all claims arising from the installation of the work contemplated in this <br /> contract prior to final settlement. <br /> SANITARY SEWER LINES: DETAILED SPECIFICATIONS FOR INSTALLATION SS-10 ' <br /> 10/15109 <br />
The URL can be used to link to this page
Your browser does not support the video tag.