Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PVC Sewer Pipe shall be installed in accordance with ASTM D-229 - Standard Recommended <br /> Practice for Underground Installation for Flexible Thermoplastic Sewer Pipe. PVC Sewer Pipe ' <br /> shall be tested by the contractor for deflection. The pipe shall be mandrelled with a rigid device <br /> sized to be cylindrical in shape and constructed with 9 to 10 evenly spaced arms. The mandrel <br /> shall be hand pulled by the contractor through all sewer lines. Any sections of sewer not ' <br /> passing the mandrel shall be uncovered and the contractor shall reround or replace the sewer <br /> and retest that section of line. The contractor shall submit mandrel drawings and testing <br /> schedule to the engineer for approval. The mandrel[ shall be sized for a 6%a deflection <br /> allowance. ' <br /> 93. Pipe Laying -Ductile Iron Sanitary Sewer Mains. Wherever, in the laying of sanitary sewer <br /> lines, the pipe must be supported on piers or where the pipe crosses under a highway that , <br /> cannot be open cut, or in shallow trenches where insufficient cover conditions exist,the Sanitary <br /> sewer lines shall be of ductile iron pipe. The material for laying and jointing the pipe shall <br /> conform to the specifications hereinbefore given for Ductile Iron Pipe. The ductile iron will be <br /> paid for at the unit price bid for the different sizes of pipe installed in the various pipe laying ' <br /> conditions. Force mains shall be of size and type as shown on the drawings and shall be <br /> installed in conformance to"Pipe Laying-General Conditions". <br /> 94. Precast Concrete Manholes. Precast concrete manholes shall be built where shown on the <br /> plans or as directed by the Engineer. The inside diameter of the manholes shall be at least four <br /> feet(4'). inverts will be built up to a depth of three-quarters (3/4) of the diameter of the pipeline <br /> as directed to properly take care of the flow through the manholes and to ease the drop from <br /> one pipe to the other. Benches shall be sloped for drainage, as shown of the Plans. Manholes <br /> shall be provided with flexible sleeves sealed with stainless steel bands at each pipe entering or <br /> exiting a manhole. ' <br /> Joints between sections of the precast manhole shall be sealed with a Neophrene "O" Ring <br /> Gasket and bitumastic rope. Manholes shall be bedded on layer of crushed stone. The stone ' <br /> shall be the same as that specified for stabilizing ditches (Size No. 67), and shall be spread in a <br /> layer at[east six inches(6")thick. <br /> The manholes shall be capped with cast iron manhole frames and covers with the frames set in ' <br /> mortar with even bearing. The C.I. Frame shall be anchored to the manhole wall as shown on <br /> the plans. After completion,all manholes will be cleaned out and left in a neat condition with all <br /> jointing material protruding from joints flattened against the wall. Open riser joints shall be <br /> grouted. Any infiltration into the manhole will not be allowed. <br /> 16. Drop Manholes. Whenever the vertical distance between outgoing and incoming sewers is <br /> more than 2.0 feet, the Engineer will require that a special drop pipe be built into the manhole. <br /> This drop shall consist of a T branch in the main sewer where it enters the manhole, and a <br /> vertical drop pipe down the side of the manhole and supported therefrom and terminating at the <br /> bottom by a quarter bend into the manhole. All piping and fittings shall be of ductile iron pipe. ' <br /> Drop pipe shall be Ductile Iron Pipe and fittings strapped to manhole wall with 1" stainless steel <br /> straps and masonry anchor bolts. ' <br /> 16. Connections to Existing Sewage Collection System. Connections to existing sewage <br /> collection systems shall be made where shown on the Plans or as directed by the Engineer. <br /> Where the connection is made at an existing manhole, it will be necessary to reconstruct the ' <br /> existing invert(s)to accommodate the new line. <br /> SANITARY SEWER LINES: DETAILED SPECIFICATIONS FOR INSTALLATION SS-6 ' <br /> 10/15/09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.