Orange County NC Website
This relates especially to the "Permit to Open Pavement"and the performance <br /> ' bond. <br /> 28. Guarantee. The Contractor shall guarantee that if any materials, <br /> ' equipment or workmanship covered by these Specifications and the <br /> accompanying Drawings proves defective within one year after final <br /> acceptance, such defects shall be made good by him. The Engineer shall <br /> provide a letter to the City indicating the start of the 92-month guarantee <br /> period. Provide State required certifications and °As Builts"with guarantee <br /> letter. <br /> 1 <br /> ' WATER LINES: DETAILED SPECIFICATIONS FOR INSTALLATION W-13 <br /> 10/15/09 <br /> 1 <br />