Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
establishment of cover, available topsoil shall be spread. Dolomitic <br /> Limestone shall be applied at the rate of 4,000 lbs., per acre and a 10-10- ' <br /> 10 commercial fertilizer mix shall be applied at the rate of 1,000 lbs., per <br /> acre to the disturbed area. It shall be worked into the soil to a depth of 3 <br /> to 4 inches. Seed shall be uniformly applied to disturbed area according , <br /> to the following schedule by broadcasting with a cyclone seeder or close <br /> drill. Seed shall be lightly covered and soil firmed. Straw mulch shall be <br /> applied to the seeded area at the rate of 1-1/2 bales per 1,000 sq. ft., and ' <br /> tacked. Tack shall conform to North Carolina Department of <br /> Transportation specifications and to Department of Transportation <br /> application rates. , <br /> SCHEDULE FOR PROVIDING PERMANENT ' <br /> VEGETATIVE COVER <br /> PLANTING PLANTS AND APPLICATION RATES <br /> MONTHS MIXTURES LBS/ACRE <br /> January, February, March,April, Tall Fescue 100 <br /> May, June, July, November, December & Rye Grain 50 , <br /> August, September, October Tall Fescue & 100 <br /> Sorghum-Sudan Hybrids 50 ' <br /> The preceding permanent cover requirements pertain to all areas ' <br /> disturbed during the project construction including road shoulders, <br /> temporary access roads, spoil areas, building sites, rights-of-way, <br /> easements and line work. Cost of which is to be incorporated into the ' <br /> overall work, unless otherwise specified in the Proposal. <br /> M Rip Ran. Rip Rap shall be installed at locations as shown on plans , <br /> or as directed by the Engineer. <br /> 27. Bonds and Permits Reguired by N.C. State Highway Commission. The ' <br /> Contractor, at his own expense,will secure from the N.C. State Highway <br /> Commission, the"Encroachment Agreement" required prior to the installation of ' <br /> that portion of this project that lies within the right-of way of the said <br /> Commission. Any or all other bonds and/or permits required by the said <br /> Commission in connection with this project shall be provided by the Contractor. ' <br /> WATER LINES: DETAILED SPECIFICATIONS FOR INSTALLATION W-12 ' <br /> 10/15/09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.